Interfaces between complex, fast-track turnkey projects

被引:0
|
作者
Bamberg, W [1 ]
Elms, CP [1 ]
机构
[1] Lea Elliott Transportat Consultants Sdn Bhd, Kuala Lumpur 59100, Malaysia
关键词
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
An overall review of the Kuala Lumpur International Airport (KLIA) project in Malaysia is provided to compare how the design/build Track Transit System (TTS) system, an automated people mover (APM), relates to the other major design/build KLIA projects (Main Terminal, Apron and Tunnel, and Satellite A Terminal) of the total airport design and construction program. Major interfaces being managed, which are typical for any such large new airport construction program, are: (1) Main Terminal interior spaces for station and ATC room; (2) Apron and service roads; (3) Tunnel under taxiway; (4) Satellite A building station accommodations and other system rooms including Central Control, maintenance, storage, UPS, PDS, and offices; (5) Underground utility services; (6) TAMS (Total Airport Management System); and (7) Other services such as power supply. The steps in defining, controlling and managing interfaces among separate design/build contracts are discussed. This includes: (1) the process of specifying interfaces and contract provisions prior to contracting, (2) refining and coordinating the interfaces during the design phase after contracts are signed, and (3) finalizing certain interfaces under a fast-track schedule where construction of some facilities are underway before the design is complete. Formal and informal procedures followed are identified and discussed as they relate to reaching agreement amongst the parties involved, control of interfaces configurations, and the overall KLIA program schedule.
引用
收藏
页码:741 / 750
页数:4
相关论文
共 50 条
  • [1] Vacuum column revamp - a fast-track turnkey project
    Hood, AR
    Stander, A
    Lilburne, G
    Soydaner, S
    [J]. HYDROCARBON PROCESSING, 1999, 78 (11): : 63 - +
  • [2] The Predictability of Fast-Track Projects
    Alhomadi, A. A.
    Dehghan, R.
    Ruwanpura, J. Y.
    [J]. PROCEEDINGS OF THE TWELFTH EAST ASIA-PACIFIC CONFERENCE ON STRUCTURAL ENGINEERING AND CONSTRUCTION (EASEC12), 2011, 14
  • [3] STREAMLINE FAST-TRACK PROJECTS
    GIORNO, C
    [J]. HYDROCARBON PROCESSING, 1993, 72 (05): : C116 - F116
  • [4] Fast-track your small projects
    Harding, JS
    [J]. CHEMICAL ENGINEERING PROGRESS, 1997, 93 (11) : 60 - 66
  • [5] Contractual Risks in Fast-Track Projects
    Moazzami, M.
    Dehghan, R.
    Ruwanpura, J. Y.
    [J]. PROCEEDINGS OF THE TWELFTH EAST ASIA-PACIFIC CONFERENCE ON STRUCTURAL ENGINEERING AND CONSTRUCTION (EASEC12), 2011, 14
  • [6] Scheduling fast-track tunnel construction projects
    Rebar, Valerie Wollet
    [J]. NORTH AMERICAN TUNNELING 2008, PROCEEDINGS, 2008, : 585 - 586
  • [7] FAST-TRACK DESIGN OF A COMPLEX MOTHERBOARD
    ULRICH, J
    [J]. HIGH PERFORMANCE SYSTEMS-THE MAGAZINE FOR TECHNOLOGY CHAMPIONS, 1989, 10 (12): : 79 - &
  • [8] REDUCING CRR IN FAST-TRACK PROJECTS THROUGH BIM
    Abdelbary, Marwan
    Edkins, Andrew
    Dorra, Elkhayam M.
    [J]. JOURNAL OF INFORMATION TECHNOLOGY IN CONSTRUCTION, 2020, 25 : 140 - 160
  • [9] Consider 'lean' engineering to fast-track mega projects
    Bennett, S.
    [J]. HYDROCARBON PROCESSING, 2012, 91 (12): : 55 - 56
  • [10] Geographic information system for coordination of fast-track projects
    Shanmugam, SP
    Parvatham, R
    Varghese, K
    [J]. COMPUTER-AIDED CIVIL AND INFRASTRUCTURE ENGINEERING, 2002, 17 (04) : 294 - 306