The Predictability of Fast-Track Projects

被引:4
|
作者
Alhomadi, A. A. [1 ]
Dehghan, R. [1 ]
Ruwanpura, J. Y. [1 ]
机构
[1] Univ Calgary, Dept Civil Engn, Calgary, AB T2N 1N4, Canada
关键词
Fast-tracking; predictability; predictability indices; CONSTRUCTION PROJECTS;
D O I
10.1016/j.proeng.2011.07.247
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Fast-Tracking to accelerate, overlap or compress schedules has an impact on project predictability in terms of achieving the planned objectives (time, cost, and quality). Predictability plays an important role in project success. Some studies focused on the fast-tracking impact on each objective; however, no research directly addressed the relationship between fast-tracking and predictability of the project's objectives. This paper investigates the relationship between fast-tracking and predictability with regard to success in meeting the project's planned objectives. A literature review was used. Significant findings in the study are the confirmations of the literature about the impact of fast-tracking on project predictability. This impact is that fast-tracking may lead to less predictability for the project's outcomes. The research results emphasize the need for further investigation of the relationship between fast-tracking technique and the project's predictability indices (cost variance, time variance and quality variance) in order to a achieve better understanding of the relationship and improve predictability. (C) 2011 Published by Elsevier Ltd.
引用
收藏
页数:7
相关论文
共 50 条
  • [1] STREAMLINE FAST-TRACK PROJECTS
    GIORNO, C
    [J]. HYDROCARBON PROCESSING, 1993, 72 (05): : C116 - F116
  • [2] Fast-track your small projects
    Harding, JS
    [J]. CHEMICAL ENGINEERING PROGRESS, 1997, 93 (11) : 60 - 66
  • [3] Fast-track your small projects
    [J]. Chem Eng Prog, 11 (60):
  • [4] Contractual Risks in Fast-Track Projects
    Moazzami, M.
    Dehghan, R.
    Ruwanpura, J. Y.
    [J]. PROCEEDINGS OF THE TWELFTH EAST ASIA-PACIFIC CONFERENCE ON STRUCTURAL ENGINEERING AND CONSTRUCTION (EASEC12), 2011, 14
  • [6] Scheduling fast-track tunnel construction projects
    Rebar, Valerie Wollet
    [J]. NORTH AMERICAN TUNNELING 2008, PROCEEDINGS, 2008, : 585 - 586
  • [7] Interfaces between complex, fast-track turnkey projects
    Bamberg, W
    Elms, CP
    [J]. AUTOMATED PEOPLE MOVERS VI: CREATIVE ACCESS FOR MAJOR ACTIVITY CENTERS, 1998, : 741 - 750
  • [8] REDUCING CRR IN FAST-TRACK PROJECTS THROUGH BIM
    Abdelbary, Marwan
    Edkins, Andrew
    Dorra, Elkhayam M.
    [J]. JOURNAL OF INFORMATION TECHNOLOGY IN CONSTRUCTION, 2020, 25 (25): : 140 - 160
  • [9] FAST-TRACK PROS AND CONS - CONSIDERATIONS FOR INDUSTRIAL PROJECTS
    WILLIAMS, GV
    [J]. JOURNAL OF MANAGEMENT IN ENGINEERING, 1995, 11 (05) : 24 - 32
  • [10] Geographic information system for coordination of fast-track projects
    Shanmugam, SP
    Parvatham, R
    Varghese, K
    [J]. COMPUTER-AIDED CIVIL AND INFRASTRUCTURE ENGINEERING, 2002, 17 (04) : 294 - 306