FAST-TRACK PROS AND CONS - CONSIDERATIONS FOR INDUSTRIAL PROJECTS

被引:39
|
作者
WILLIAMS, GV
机构
[1] Bechtel Corp., Houston, TX, 77056, 3000 Post Oak Blvd.
关键词
Construction industry - Engineers - Philosophical aspects - Construction - Time and motion study - Work simplification;
D O I
10.1061/(ASCE)0742-597X(1995)11:5(24)
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Several years ago Tom Peters produced a video discussing the benefits of reducing durations. He talked about how Motorola was able to reduce the time it took to build a beeper from 40 days down to 2 or 3 days. He went on to talk about how this was the wave of the future and how this would be the savior of American business. We in the business of building industrial facilities passed it off as another fad. We were already building facilities as fast as we could. We could not improve our times significantly, These numbers Peters described, of reducing times by 50%, 60%, or 70%, were a pipe dream, at least in our business. Or were they? After recently completing a fast-track project of our own we learned some valuable lessons. We learned what is attainable, what it takes, and what it will take to do this kind of project on a more routine basis.
引用
收藏
页码:24 / 32
页数:9
相关论文
共 50 条
  • [1] The Predictability of Fast-Track Projects
    Alhomadi, A. A.
    Dehghan, R.
    Ruwanpura, J. Y.
    PROCEEDINGS OF THE TWELFTH EAST ASIA-PACIFIC CONFERENCE ON STRUCTURAL ENGINEERING AND CONSTRUCTION (EASEC12), 2011, 14
  • [2] STREAMLINE FAST-TRACK PROJECTS
    GIORNO, C
    HYDROCARBON PROCESSING, 1993, 72 (05): : C116 - F116
  • [3] Fast-track your small projects
    Harding, JS
    CHEMICAL ENGINEERING PROGRESS, 1997, 93 (11) : 60 - 66
  • [4] Fast-track your small projects
    Chem Eng Prog, 11 (60):
  • [5] Contractual Risks in Fast-Track Projects
    Moazzami, M.
    Dehghan, R.
    Ruwanpura, J. Y.
    PROCEEDINGS OF THE TWELFTH EAST ASIA-PACIFIC CONFERENCE ON STRUCTURAL ENGINEERING AND CONSTRUCTION (EASEC12), 2011, 14
  • [7] Scheduling fast-track tunnel construction projects
    Rebar, Valerie Wollet
    NORTH AMERICAN TUNNELING 2008, PROCEEDINGS, 2008, : 585 - 586
  • [8] Optimized variable resource allocation framework for scheduling of fast-track industrial construction projects
    Taghaddos, Maedeh
    Mousaei, Ali
    Taghaddos, Hosein
    Hermann , Ulrich
    Mohamed, Yasser
    Abourizk, Simaan
    AUTOMATION IN CONSTRUCTION, 2024, 158
  • [9] Safety considerations for fast-track linear projects using directional boring, plowing and trenching techniques
    Hill, PG
    1999 RAPID EXCAVATION AND TUNNELING CONFERENCE, PROCEEDINGS, 1999, : 259 - 265
  • [10] Interfaces between complex, fast-track turnkey projects
    Bamberg, W
    Elms, CP
    AUTOMATED PEOPLE MOVERS VI: CREATIVE ACCESS FOR MAJOR ACTIVITY CENTERS, 1998, : 741 - 750