Developing a Value-Risk Management Model for Construction Projects

被引:1
|
作者
Leung, Mei-yung [1 ]
Wei, Xiaoyi [2 ]
Ojo, Lekan Damilola [1 ]
机构
[1] City Univ Hong Kong, Dept Architecture & Civil Engn, Kowloon Tong, Kowloon, 80 Tat Chee Ave, Hong Kong, Peoples R China
[2] Guangxi Univ Finance & Econ, Nanning, Guangxi, Peoples R China
关键词
Decision-making; Risk management; Value management; Project performance; Teamwork; Satisfaction; IDENTIFICATION; ENVIRONMENT;
D O I
10.1061/JCEMD4.COENG-13396
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Value management (VM) and risk management (RM) both involve systematic team decision-making methodologies, but they are often used separately by construction professionals in real practices for different purposes. VM emphases the best project value, while RM is expected to minimize the project risks. The major difference between the two methodologies may lie in the function analysis phase of VM for identifying key functions of projects, and the risk analysis of RM for risk identification. Due to the complementary nature of the techniques involved in both forms of management, the integration of VM and RM has been advocated by scholars for about three decades to optimize the final outcome within limited time and resources. However, little attention has been paid to establishing the complex relationships between value-risk management (VRM) techniques and their outcomes. Therefore, this study aims to find an effective way to integrate VM and RM for enhancing final outcomes. A questionnaire survey was conducted to construction professionals with experience in VM and/or RM. Through various statistical analyses, including factor analysis, correlation, and multiple regression analysis, the findings indicate that (1) information and creativity techniques aided development techniques significantly; (2) presentation techniques are determined by information and function analysis techniques; (3) information techniques, risk analysis techniques, and development techniques enhance team and project performance in VRM workshops; and (4) function analysis techniques, risk analysis techniques, and development techniques can improve overall satisfaction on construction projects. To ensure risk minimization and value maximization in construction projects, VRM workshops should be harnessed and undertaken systematically and logically. Practical recommendations regarding sufficient information and discussion time for VRM participants are given to ensure stakeholders gain the comprehensive understanding of the peculiarity of the project at hand necessary to propel creative ideas and achieve the objectives of the workshop. In the real construction industry, it is time consuming and costly for project practitioners to conduct value management for enhancing project value and risk management to minimize impending risks separately. In this research, value management and risk management techniques were integrated in team decision-making process (value-risk management process) to help project practitioners make the best decisions with fewer risks logically for achieving the best project value. For enhancing final outcomes such as reducing project cost, facilitating team cooperation, and improving overall satisfaction, several practical recommendations are proposed for project practitioners to conduct the value-risk management process effectively: for example, allocating sufficient time for VRM practitioners to share and review information and identify possible risks, conducting function analysis training to the VRM practitioners, using risk analysis software during the VRM process, and requiring VRM practitioners work together to develop a comprehensive final report. The VRM participants need to use function analysis techniques to identify the key functions for value enhancement. The VRM workshop facilitator must be competent in all the techniques for applications on the project. In addition, the report should contain sufficient justifications such as calculations, possible cost-saving, advantages, and disadvantages of final ideas agreed upon by the VRM participants.
引用
收藏
页数:13
相关论文
共 50 条
  • [31] Risk management in oil refinery construction projects
    Ginsburg, Alexander
    Khripushin, Alexey
    INFORMATION TECHNOLOGY APPLICATIONS IN INDUSTRY II, PTS 1-4, 2013, 411-414 : 2313 - +
  • [32] Identification and risk management related to construction projects
    Boughaba, Amina
    Bouabaz, Mohamed
    ADVANCES IN COMPUTATIONAL DESIGN, 2020, 5 (04): : 445 - 465
  • [33] GUIDELINES TO RISK MANAGEMENT MATURITY IN CONSTRUCTION PROJECTS
    Gusmao Caiado, Rodrigo Goyannes
    Alves Lima, Gilson Brito
    de Mattos Nascimento, Daniel Luiz
    Neto, Julio Vieira
    Maultasch de Oliveira, Rodolpho Augusto
    BRAZILIAN JOURNAL OF OPERATIONS & PRODUCTION MANAGEMENT, 2016, 13 (03) : 372 - 385
  • [34] Barriers to the implementation of value management in small construction projects
    Lin, Xiaobin
    Mazlan, Ain Naadia
    Ismail, Syuhaida
    JOURNAL OF BUILDING ENGINEERING, 2022, 54
  • [35] RISK AND ITS MANAGEMENT IN CONSTRUCTION PROJECTS - DISCUSSION
    BARNES, M
    NORMAN, A
    BUTLER, RJ
    CORRIE, RK
    PERRY, JG
    HAYES, RW
    PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS PART 1-DESIGN AND CONSTRUCTION, 1986, 80 : 757 - 764
  • [36] PRODUCTIVITY AND VALUE MANAGEMENT ON UTILITY CONSTRUCTION AND MAINTENANCE PROJECTS
    PICARD, HE
    PROCEEDINGS OF THE 1991 PMI ANNUAL SEMINAR / SYMPOSIUM : MANAGING FOR QUALITY, 1991, : 201 - 208
  • [37] Earned Value Management System in Indonesian Construction Projects
    Priyo, Mandiyo
    INTERNATIONAL JOURNAL OF INTEGRATED ENGINEERING, 2021, 13 (03): : 37 - 45
  • [38] Critical Obstacles in the Implementation of Value Management of Construction Projects
    Li, Xiaoyu
    Deng, Binchao
    Yin, Yilin
    Jia, Yu
    BUILDINGS, 2022, 12 (05)
  • [39] The Methodology of Using Value Engineering in Construction Projects Management
    Rad, Kaveh Miladi
    Yamini, O. Aminoroaya
    CIVIL ENGINEERING JOURNAL-TEHRAN, 2016, 2 (06): : 262 - 269
  • [40] Managing Construction Projects Using the Advanced Programmatic Risk Analysis and Management Model
    Imbeah, William
    Guikema, Seth
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2009, 135 (08): : 772 - 781