Developing a Value-Risk Management Model for Construction Projects

被引:1
|
作者
Leung, Mei-yung [1 ]
Wei, Xiaoyi [2 ]
Ojo, Lekan Damilola [1 ]
机构
[1] City Univ Hong Kong, Dept Architecture & Civil Engn, Kowloon Tong, Kowloon, 80 Tat Chee Ave, Hong Kong, Peoples R China
[2] Guangxi Univ Finance & Econ, Nanning, Guangxi, Peoples R China
关键词
Decision-making; Risk management; Value management; Project performance; Teamwork; Satisfaction; IDENTIFICATION; ENVIRONMENT;
D O I
10.1061/JCEMD4.COENG-13396
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Value management (VM) and risk management (RM) both involve systematic team decision-making methodologies, but they are often used separately by construction professionals in real practices for different purposes. VM emphases the best project value, while RM is expected to minimize the project risks. The major difference between the two methodologies may lie in the function analysis phase of VM for identifying key functions of projects, and the risk analysis of RM for risk identification. Due to the complementary nature of the techniques involved in both forms of management, the integration of VM and RM has been advocated by scholars for about three decades to optimize the final outcome within limited time and resources. However, little attention has been paid to establishing the complex relationships between value-risk management (VRM) techniques and their outcomes. Therefore, this study aims to find an effective way to integrate VM and RM for enhancing final outcomes. A questionnaire survey was conducted to construction professionals with experience in VM and/or RM. Through various statistical analyses, including factor analysis, correlation, and multiple regression analysis, the findings indicate that (1) information and creativity techniques aided development techniques significantly; (2) presentation techniques are determined by information and function analysis techniques; (3) information techniques, risk analysis techniques, and development techniques enhance team and project performance in VRM workshops; and (4) function analysis techniques, risk analysis techniques, and development techniques can improve overall satisfaction on construction projects. To ensure risk minimization and value maximization in construction projects, VRM workshops should be harnessed and undertaken systematically and logically. Practical recommendations regarding sufficient information and discussion time for VRM participants are given to ensure stakeholders gain the comprehensive understanding of the peculiarity of the project at hand necessary to propel creative ideas and achieve the objectives of the workshop. In the real construction industry, it is time consuming and costly for project practitioners to conduct value management for enhancing project value and risk management to minimize impending risks separately. In this research, value management and risk management techniques were integrated in team decision-making process (value-risk management process) to help project practitioners make the best decisions with fewer risks logically for achieving the best project value. For enhancing final outcomes such as reducing project cost, facilitating team cooperation, and improving overall satisfaction, several practical recommendations are proposed for project practitioners to conduct the value-risk management process effectively: for example, allocating sufficient time for VRM practitioners to share and review information and identify possible risks, conducting function analysis training to the VRM practitioners, using risk analysis software during the VRM process, and requiring VRM practitioners work together to develop a comprehensive final report. The VRM participants need to use function analysis techniques to identify the key functions for value enhancement. The VRM workshop facilitator must be competent in all the techniques for applications on the project. In addition, the report should contain sufficient justifications such as calculations, possible cost-saving, advantages, and disadvantages of final ideas agreed upon by the VRM participants.
引用
收藏
页数:13
相关论文
共 50 条
  • [11] Risk management in construction projects
    Szymanski, Pawel
    INNOVATIVE SOLUTIONS IN CONSTRUCTION ENGINEERING AND MANAGEMENT: FLEXIBILITY IN SUSTAINABLE CONSTRUCTION, 2017, 208 : 174 - 182
  • [12] Risk management in construction projects
    Iqbal, Shahid
    Choudhry, Rafiq M.
    Holschemacher, Klaus
    Ali, Ahsan
    Tamosaitiene, Jolanta
    TECHNOLOGICAL AND ECONOMIC DEVELOPMENT OF ECONOMY, 2015, 21 (01) : 65 - 78
  • [13] A risk management model for large projects in the construction phase in Egypt
    Habib, Mohamed Mostafa
    Eldawla, Marwa Ahmed Kamer
    Zaki, Mahmoud Ahmed
    JOURNAL OF PROJECT MANAGEMENT, 2022, : 25 - 36
  • [14] A Model for Risk Assessment and Management of Construction Projects in Urban Conditions
    Siemaszko, Agata
    Kristowski, Adam
    Grzyl, Beata
    2018 BALTIC GEODETIC CONGRESS (BGC-GEOMATICS 2018), 2018, : 7 - 11
  • [15] A risk management model for large projects in the construction phase in Egypt
    Habib, Mohamed Mostafa
    Eldawla, Marwa Ahmed Kamer
    Zaki, Mahmoud Ahmed
    JOURNAL OF PROJECT MANAGEMENT, 2023, 8 (01) : 25 - 36
  • [16] Risk Management of Construction Projects Based on Sandpile Model: a Frame of Risk Conduction
    Xu, B. B.
    Chen, Y. Q.
    Wang, C. M.
    2013 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM 2013), 2013, : 1530 - 1534
  • [17] Risk Management for Housing and Construction Projects
    Yang J.
    Yin S.
    Journal of Engineering, Project, and Production Management, 2024, 14 (01)
  • [18] Risk Management Methods in Construction Projects
    Rehacek, Petr
    Bazsova, Blanka
    VISION 2020: SUSTAINABLE ECONOMIC DEVELOPMENT, INNOVATION MANAGEMENT, AND GLOBAL GROWTH, VOLS I-IX, 2017, 2017, : 3060 - 3069
  • [19] Risk management for overseas construction projects
    Zhi, He
    International Journal of Project Management, 1995, 13 (04):
  • [20] Financial risk management in the construction projects
    Shibani A.
    Hasan D.
    Saaifan J.
    Sabboubeh H.
    Eltaip M.
    Saidani M.
    Gherbal N.
    Journal of King Saud University - Engineering Sciences, 2024, 36 (08) : 552 - 561