Risk management in construction projects

被引:100
|
作者
Iqbal, Shahid [1 ]
Choudhry, Rafiq M. [2 ]
Holschemacher, Klaus [3 ]
Ali, Ahsan [1 ]
Tamosaitiene, Jolanta [4 ]
机构
[1] Tech Univ Bergakad Freiberg, Fac Mat Sci & Technol, Freiberg, Germany
[2] King Faisal Univ, Coll Engn, Al Hafuf, Al Ahsa, Saudi Arabia
[3] Leipzig Univ Appl Sci HTWK Leipzig, Fac Civil Engn, D-04277 Leipzig, Germany
[4] Vilnius Gediminas Tech Univ, Fac Civil Engn, LT-2040 Vilnius, Lithuania
关键词
assessment; construction; risk; MODEL; INDUSTRY; IDENTIFICATION; SELECTION; SYSTEM; COPRAS; AHP;
D O I
10.3846/20294913.2014.994582
中图分类号
F [经济];
学科分类号
02 ;
摘要
Risk management is an important field of construction industry and has gained more importance internationally due to the latest researches carried out on a large scale. However, this relatively new field requires more attention to bring some benefit. Construction projects are facing a number of risks which have negative effects on project objects such as time, cost and quality. This study is based on findings of a questionnaire-based survey on risk management in construction projects in Pakistan, reporting the significance of different type of risk, ultimate responsibility for them and the effectiveness of some most common risk management techniques practiced in the industry. Two types of risk management techniques were considered: preventive techniques which can be used before the start of a project to manage risks that are anticipated during the project execution; and remedial techniques that are used during the execution phase once a risk has already occurred. The study revealed that financial issues for projects, accidents on site and defective design are the most significant risks affecting most of construction projects. As further reported, the contractor is responsible for management of most risks occurring at sites during the implementation phase, such as issues related to subcontractors, labour, machinery, availability of materials and quality, while the client is responsible for the risks such as financial issues, issues related to design documents, changes in codes and regulations, and scope of work. Further reported results of the analysis demonstrate that the production of proper schedule by getting updated data of the project and guidance from previous similar projects are the most effective preventive risk management techniques while close supervision and coordination within projects are the most effective remedial risk management techniques. It may be concluded that the most significant risks must be managed with greater effort to reduce/eliminate their effects on the project. As the study concludes, preparation of a proper schedule and good coordination during the implementation stage are very important as they may help project managers to focus on critical areas for better management of projects in Pakistan.
引用
收藏
页码:65 / 78
页数:14
相关论文
共 50 条
  • [1] Risk management in construction projects
    Szymanski, Pawel
    [J]. INNOVATIVE SOLUTIONS IN CONSTRUCTION ENGINEERING AND MANAGEMENT: FLEXIBILITY IN SUSTAINABLE CONSTRUCTION, 2017, 208 : 174 - 182
  • [2] Risk Management for Housing and Construction Projects
    Yang, Jun
    Yin, Sijia
    [J]. Journal of Engineering, Project, and Production Management, 2024, 14 (01)
  • [3] Risk Management Methods in Construction Projects
    Rehacek, Petr
    Bazsova, Blanka
    [J]. VISION 2020: SUSTAINABLE ECONOMIC DEVELOPMENT, INNOVATION MANAGEMENT, AND GLOBAL GROWTH, VOLS I-IX, 2017, 2017, : 3060 - 3069
  • [4] A risk management model for construction projects
    Smit, S
    Al-Jibouri, S
    van den Adel, J
    [J]. SYSTEM-BASED VISION FOR STRATEGIC AND CREATIVE DESIGN, VOLS 1-3, 2003, : 2233 - 2238
  • [5] RISK AND ITS MANAGEMENT IN CONSTRUCTION PROJECTS
    PERRY, JG
    HAYES, RW
    [J]. PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS PART 1-DESIGN AND CONSTRUCTION, 1985, 78 (JUN): : 499 - 521
  • [6] Risk management and risk management performance measurement in the construction projects of Finland
    Rahman, Mohammad Shakilur
    Adnan, Tasminur Mannan
    [J]. JOURNAL OF PROJECT MANAGEMENT, 2020, 5 (03) : 167 - 178
  • [7] An Integrated Risk Management Model for Construction Projects
    Zhao, Zhen-Yu
    Duan, Lin-Ling
    [J]. 2008 PORTLAND INTERNATIONAL CONFERENCE ON MANAGEMENT OF ENGINEERING & TECHNOLOGY, VOLS 1-5, 2008, : 1389 - 1394
  • [8] Research for Risk Management of Construction Projects in Taiwan
    Lin, Chien-Liang
    Chen, Bey-Kun
    [J]. SUSTAINABILITY, 2021, 13 (04) : 1 - 15
  • [9] Risk management in oil refinery construction projects
    Ginsburg, Alexander
    Khripushin, Alexey
    [J]. INFORMATION TECHNOLOGY APPLICATIONS IN INDUSTRY II, PTS 1-4, 2013, 411-414 : 2313 - +
  • [10] Identification and risk management related to construction projects
    Boughaba, Amina
    Bouabaz, Mohamed
    [J]. ADVANCES IN COMPUTATIONAL DESIGN, 2020, 5 (04): : 445 - 465