An Efcient Approach for Solving Yard Crane Scheduling in a Container Terminal

被引:3
|
作者
何军良 [1 ,2 ]
张为民 [1 ]
黄有方 [2 ]
严伟 [2 ]
机构
[1] School of Mechanical Engineering, Tongji University
[2] Engineering Research Center of Container Supply Chain Technology, Ministry of Education,Shanghai Maritime University
基金
中国国家自然科学基金;
关键词
container terminal; yard crane scheduling; mixed integer programming; heuristic algorithm;
D O I
暂无
中图分类号
U656.135 [];
学科分类号
0814 ; 081505 ; 082401 ;
摘要
An efcient approach for yard crane(YC)scheduling is proposed in this paper.The definition of task group for YC scheduling is proposed.A mixed integer programming(MIP)model is developed.In the model,objective functions are subject to the minimization of the total delay of complete time for all task groups and the minimization of block-to-block movements of YCs.Due to the computational scale of the non-deterministic polynomial(NP)complete problem regarding YC scheduling,a rolling-horizon decision-making strategy is employed to solve this problem,by converting the MIP model into another MIP model in the scheduling of each rolling period.Afterwards,a heuristic algorithm based on modified A*search is developed to solve the converted model and obtain near optimal solution.Finally,the computational experiments are used to examine the performance of the proposed approach for YC scheduling.
引用
收藏
页码:606 / 619
页数:14
相关论文
共 50 条
  • [21] Ant Colony System for Solving Quay Crane Scheduling Problem in Container Terminal
    Azza, Lajjam
    El Merouani, Mohamed
    Medouri, Adbdellatif
    [J]. PROCEEDINGS OF 2014 2ND IEEE INTERNATIONAL CONFERENCE ON LOGISTICS AND OPERATIONS MANAGEMENT (GOL 2014), 2014, : 176 - 180
  • [22] A quay crane scheduling algorithm considering the workload of yard cranes in a container yard
    Wang, Yan
    Kim, Kap Hwan
    [J]. JOURNAL OF INTELLIGENT MANUFACTURING, 2011, 22 (03) : 459 - 470
  • [23] A quay crane scheduling algorithm considering the workload of yard cranes in a container yard
    Yan Wang
    Kap Hwan Kim
    [J]. Journal of Intelligent Manufacturing, 2011, 22 : 459 - 470
  • [24] Simultaneous Load Scheduling of Quay Crane and Yard Crane in Port Container Terminals
    Lee, Der-Horng
    Cao, Zhi
    Chen, Jiang Hang
    Cao, Jin Xin
    [J]. TRANSPORTATION RESEARCH RECORD, 2009, (2097) : 62 - 69
  • [25] A new solution approach for the twin yard crane scheduling problem in automated container terminals
    Oladugba, Andrew Omoniyi
    Gheith, Mohamed
    Eltawil, Amr
    [J]. ADVANCED ENGINEERING INFORMATICS, 2023, 57
  • [26] Optimization Approach for Yard Crane Scheduling Problem under a combined constraints in Container Terminals
    Torbi, Imane
    Aidi, Sanaa
    Mazouzi, Mohamed
    Belassiria, Imad
    [J]. 2022 14TH INTERNATIONAL COLLOQUIUM OF LOGISTICS AND SUPPLY CHAIN MANAGEMENT (LOGISTIQUA2022), 2022, : 412 - 417
  • [27] Discrete time model and algorithms for container yard crane scheduling
    Li, Wenkai
    Wu, Yong
    Petering, M. E. H.
    Goh, Mark
    de Souza, Robert
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2009, 198 (01) : 165 - 172
  • [28] Models and algorithms for a yard crane scheduling problem in container ports
    Vallada, Eva
    Belenguer, Jose Manuel
    Villa, Fulgencia
    Alvarez-Valdes, Ramon
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2023, 309 (02) : 910 - 924
  • [29] Scheduling of Different Automated Yard Crane Systems at Container Terminals
    Speer, Ulf
    Fischer, Kathrin
    [J]. TRANSPORTATION SCIENCE, 2017, 51 (01) : 305 - 324
  • [30] Yard crane and AGV scheduling in automated container terminal: A multi-robot task allocation framework
    Chen, Xuchao
    He, Shiwei
    Zhang, Yongxiang
    Tong, Lu
    Shang, Pan
    Zhou, Xuesong
    [J]. TRANSPORTATION RESEARCH PART C-EMERGING TECHNOLOGIES, 2020, 114 : 241 - 271