Construction and alignment control of the middle steel pylon of Taizhou Bridge

被引:2
|
作者
Ji Lin 1
2.CCCC Second Harbour Engineering Company Limited
机构
关键词
construction; alignment control; steel pylon; whole process;
D O I
暂无
中图分类号
U445.4 [施工技术];
学科分类号
摘要
The general construction procedure of the steel middle pylon is briefly introduced. The alignment control of the pylon is carried out during the whole process of the construction. The control concept is extended to the manufacture stage. The manufacturing alignment error is strictly controlled in the segments precast process in factory, and the error is recognized and predicted precisely during the installation stage. The adjusting joints are employed to amend the accumulated error, which ensure that the steel pylon alignment could satisfy the precision requirements after installation.
引用
收藏
页码:46 / 50
页数:5
相关论文
共 50 条
  • [31] Stress analysis of steel anchor box in anchorage zone of steel pylon of a single-pylon cable-stayed bridge
    Wang, Chong
    Zhou, Li
    Sun, Dong-Li
    Wang, Ying
    Bridge Construction, 2015, 45 (03) : 51 - 57
  • [32] Alignment Control during Construction of Continuous Bridge Suspended by Triangle Frame
    Huang Yan
    Qi Lukuan
    Zhou Wu
    ADVANCES IN CIVIL ENGINEERING, PTS 1-6, 2011, 255-260 : 811 - +
  • [33] Design of steel box girder for Taizhou Yangtze River Highway Bridge
    Ding Lei
    EngineeringSciences, 2011, 9 (02) : 57 - 63
  • [34] The Analysis of Sloping Cable-Stayed Bridge Pylon in Construction Stage
    Wang Xin-zhong
    Li Chuan-xi
    CIVIL ENGINEERING IN CHINA - CURRENT PRACTICE AND RESEARCH REPORT, 2010, : 108 - +
  • [35] Monitoring and control of steel truss arch bridge jacking construction
    Zheng, Xilong
    Guan, Di
    ARCHIVES OF CIVIL ENGINEERING, 2024, 70 (03) : 19 - 37
  • [36] A Professional Safety Consultant Mode for Engineering Construction and its Application in Taizhou Bridge
    Liu Xiao-yong
    Zhang Er-qiang
    Hu Yi-ming
    Han Hui
    MATERIALS, TRANSPORTATION AND ENVIRONMENTAL ENGINEERING, PTS 1 AND 2, 2013, 779-780 : 626 - +
  • [37] The Alignment Control Analysis of Cantilever Construction for Large Span Composite Continuous Box-girder Bridge with Corrugated Steel Webs
    Li, Ming
    Lu, Jianming
    Song, Jianyong
    ADVANCED BUILDING MATERIALS, PTS 1-4, 2011, 250-253 (1-4): : 1561 - 1566
  • [38] Design of Steel Truss Girder of Main Bridge of Jiaojiang Bridge on Hangzhou-Shaoxing-Taizhou Railway
    杭绍台铁路椒江特大桥主桥钢桁梁设计
    Su, Guo-Ming (suguoming@t5y.cn), 2018, Wuhan Bridge Research Institute (48)
  • [39] Seismic performance analysis of concrete-filled steel tubular single pylon cable-stayed bridge with swivel construction
    Xiao, Junhua
    Liu, Miao
    Zhong, Tieyi
    Fu, Guangzhi
    2018 INTERNATIONAL CONFERENCE ON CIVIL, ARCHITECTURE AND DISASTER PREVENTION, 2019, 218
  • [40] Key Techniques for Construction of North Pylon of Qingshan Changjiang River Bridge in Wuhan
    Zhang, Chun-Xin
    Zhang, Jing
    Hu, Hai-Bo
    Bridge Construction, 2019, 49 (02) : 1 - 6