Construction and alignment control of the middle steel pylon of Taizhou Bridge

被引:2
|
作者
Ji Lin 1
2.CCCC Second Harbour Engineering Company Limited
机构
关键词
construction; alignment control; steel pylon; whole process;
D O I
暂无
中图分类号
U445.4 [施工技术];
学科分类号
摘要
The general construction procedure of the steel middle pylon is briefly introduced. The alignment control of the pylon is carried out during the whole process of the construction. The control concept is extended to the manufacture stage. The manufacturing alignment error is strictly controlled in the segments precast process in factory, and the error is recognized and predicted precisely during the installation stage. The adjusting joints are employed to amend the accumulated error, which ensure that the steel pylon alignment could satisfy the precision requirements after installation.
引用
收藏
页码:46 / 50
页数:5
相关论文
共 50 条
  • [21] Construction Monitoring of Main Bridge of Jiaojiang River Bridge of Hangzhou-Taizhou Railway
    Wu, Jie-Liang
    Liu, Xiu-Ling
    Wang, Sheng-Hu
    Yang, Jing
    Bridge Construction, 2022, 52 (02) : 126 - 133
  • [22] Construction Alignment Control of Continuous Steel Truss Girder and Flexible Arch Bridge of High-speed Railway
    Lin, Pengzhen
    Liu, Yinglong
    He, Zhigang
    Journal of Railway Engineering Society, 2019, 36 (11) : 45 - 50
  • [23] Research on Construction Technology of Inclined Pylon of Single Pylon Cable-stayed Bridge without Backstays
    Zhu, Yinglei
    ADVANCES IN CIVIL ENGINEERING, PTS 1-4, 2011, 90-93 : 1168 - 1172
  • [24] Design and construction control of active cross bracings for bidirectional tilting pylon of cable-stayed bridge
    Li, Y. (roger_liyi@126.com), 1600, Wuhan Bridge Research Institute (43):
  • [25] Construction techniques of super-length main cable of Taizhou Bridge
    Shen Liangcheng
    EngineeringSciences, 2011, 9 (02) : 51 - 56
  • [26] Design and key construction technology of steel-concrete-steel sandwich composite pylon for a large span cable-stayed bridge
    Pei, Bida
    Chong, Aixiu
    Xia, Huan
    Kang, Xueyun
    SCIENTIFIC REPORTS, 2023, 13 (01):
  • [27] Design and key construction technology of steel-concrete-steel sandwich composite pylon for a large span cable-stayed bridge
    Bida Pei
    Aixiu Chong
    Huan Xia
    Xueyun Kang
    Scientific Reports, 13 (1)
  • [28] Analysis of Parameter Sensitivity in Construction Control of Inclined Pylon Cable-stayed Bridge without Backstays
    Zhang, Qingchen
    Sun, Quansheng
    ADVANCES IN CIVIL ENGINEERING, PTS 1-6, 2011, 255-260 : 851 - 855
  • [29] Key Techniques for Construction Control of a Curved Single Pylon Cable-Stayed Bridge Without Backstays
    Yi, Yun-Kun
    Bridge Construction, 2018, 48 (02) : 116 - 120
  • [30] Research on Synchronous Construction Control Technology for the Pylon and Girder of Maling River Cable-stayed Bridge
    Xiong, Shao-Hui
    Zhang, You-Jin
    PROCEEDINGS OF THE 2ND ANNUAL INTERNATIONAL CONFERENCE ON ADVANCED MATERIAL ENGINEERING (AME 2016), 2016, 85 : 778 - 790