The Influence of Intelligent Guided Vehicle Configuration on Equipment Scheduling in the Railway Yards of Automated Container Terminals

被引:0
|
作者
Chen, Hongbin [1 ,2 ]
Liu, Wei [2 ]
机构
[1] Jimei Univ, Nav Coll, Xiamen 361021, Peoples R China
[2] Shanghai Maritime Univ, Coll Transport & Commun, Shanghai 201306, Peoples R China
关键词
IGV; ARMG; adaptive large neighborhood search; railway yards of automated container terminals; QUAY CRANE; STORAGE; TRUCK;
D O I
10.3390/jmse12101713
中图分类号
U6 [水路运输]; P75 [海洋工程];
学科分类号
0814 ; 081505 ; 0824 ; 082401 ;
摘要
The efficiency of collecting and distributing goods has been improved by establishing railway lines that serve new automated container terminals (ACTs) and by constructing central railway stations close to ports. To aid in this process, intelligent guided vehicles (IGVs), which are renowned for their flexibility and for the convenience with which one can adjust their number and speed, have been developed to be used as horizontal transport vehicles that can transport goods between the railway yard and the front of the port. However, they also introduce some difficulties and complexities that affect terminal scheduling. Therefore, we took the automated rail-mounted container gantry crane (ARMG) scheduling problem as our main research object in this study. We established a mixed-integer linear programming (MILP) model to minimize the makespan of ARMGs, designed an adaptive large neighborhood search (ALNS) algorithm, and explored the influence of IGV configuration on ARMG scheduling through a series of experiments applied to a series of large-scale numerical examples. The experimental results show that increasing the number of IGVs can improve the operational efficiency of railway yards, but this strategy reduces the overall time taken for the ARMG to complete various tasks. Increasing or decreasing the speed of the IGVs within a given range has a clear effect on the problem at hand, while increasing the IGV travel speed can effectively reduce the time required for the ARMG to complete various tasks. Operators must properly adjust the IGV speed to meet the requirements of the planned operation.
引用
收藏
页数:18
相关论文
共 50 条
  • [31] Integrated optimization on yard crane scheduling and vehicle positioning at container yards
    Zhou, Chenhao
    Lee, Byung Kwon
    Li, Haobin
    TRANSPORTATION RESEARCH PART E-LOGISTICS AND TRANSPORTATION REVIEW, 2020, 138
  • [32] Blocks allocation and handling equipment scheduling in automatic container terminals
    Yue, Li-Jun
    Fan, Hou-Ming
    Fan, Hao
    TRANSPORTATION RESEARCH PART C-EMERGING TECHNOLOGIES, 2023, 153
  • [33] Multiagent Q-Learning Approach for the Recharging Scheduling of Electric Automated Guided Vehicles in Container Terminals
    Zhou, Chenhao
    Stephen, Aloisius
    Tan, Kok Choon
    Chew, Ek Peng
    Lee, Loo Hay
    TRANSPORTATION SCIENCE, 2024, 58 (03) : 664 - 683
  • [34] Scheduling of Different Automated Yard Crane Systems at Container Terminals
    Speer, Ulf
    Fischer, Kathrin
    TRANSPORTATION SCIENCE, 2017, 51 (01) : 305 - 324
  • [35] Cranes scheduling in frame bridges based automated container terminals
    Zhen, Lu
    Hu, Hongtao
    Wang, Wencheng
    Shi, Xin
    Ma, Chengle
    TRANSPORTATION RESEARCH PART C-EMERGING TECHNOLOGIES, 2018, 97 : 369 - 384
  • [36] An integrated scheduling method for AGV routing in automated container terminals
    Yang, Yongsheng
    Zhong, Meisu
    Dessouky, Yasser
    Postolache, Octavian
    COMPUTERS & INDUSTRIAL ENGINEERING, 2018, 126 : 482 - 493
  • [37] Optimizing multiple equipment scheduling for U-shaped automated container terminals considering loading and unloading operations
    Zhang, Xiang
    Hong, Ziyan
    Xi, Haoning
    Li, Jingwen
    COMPUTER-AIDED CIVIL AND INFRASTRUCTURE ENGINEERING, 2024, 39 (20) : 3103 - 3124
  • [38] Collaborative scheduling of handling equipment in automated container terminals with limited AGV-mates considering energy consumption
    Yang, Xurui
    Hu, Hongtao
    Cheng, Chen
    ADVANCED ENGINEERING INFORMATICS, 2025, 65
  • [39] A mathematical formulation for integrated scheduling problem of handling equipment in container terminals
    Zheng, Yan
    Xiao, Yujie
    PROCEEDINGS OF THE 2ND INTERNATIONAL CONFERENCE ON ECONOMICS AND MANAGEMENT, EDUCATION, HUMANITIES AND SOCIAL SCIENCES (EMEHSS 2018), 2018, 151 : 538 - 543
  • [40] Scheduling of twin automatic stacking cranes and automated guided vehicle considering buffer mode on automated container terminal
    Zhu, Jin
    Ma, Feiyang
    COMPUTERS & INDUSTRIAL ENGINEERING, 2024, 193