The Influence of Intelligent Guided Vehicle Configuration on Equipment Scheduling in the Railway Yards of Automated Container Terminals

被引:0
|
作者
Chen, Hongbin [1 ,2 ]
Liu, Wei [2 ]
机构
[1] Jimei Univ, Nav Coll, Xiamen 361021, Peoples R China
[2] Shanghai Maritime Univ, Coll Transport & Commun, Shanghai 201306, Peoples R China
关键词
IGV; ARMG; adaptive large neighborhood search; railway yards of automated container terminals; QUAY CRANE; STORAGE; TRUCK;
D O I
10.3390/jmse12101713
中图分类号
U6 [水路运输]; P75 [海洋工程];
学科分类号
0814 ; 081505 ; 0824 ; 082401 ;
摘要
The efficiency of collecting and distributing goods has been improved by establishing railway lines that serve new automated container terminals (ACTs) and by constructing central railway stations close to ports. To aid in this process, intelligent guided vehicles (IGVs), which are renowned for their flexibility and for the convenience with which one can adjust their number and speed, have been developed to be used as horizontal transport vehicles that can transport goods between the railway yard and the front of the port. However, they also introduce some difficulties and complexities that affect terminal scheduling. Therefore, we took the automated rail-mounted container gantry crane (ARMG) scheduling problem as our main research object in this study. We established a mixed-integer linear programming (MILP) model to minimize the makespan of ARMGs, designed an adaptive large neighborhood search (ALNS) algorithm, and explored the influence of IGV configuration on ARMG scheduling through a series of experiments applied to a series of large-scale numerical examples. The experimental results show that increasing the number of IGVs can improve the operational efficiency of railway yards, but this strategy reduces the overall time taken for the ARMG to complete various tasks. Increasing or decreasing the speed of the IGVs within a given range has a clear effect on the problem at hand, while increasing the IGV travel speed can effectively reduce the time required for the ARMG to complete various tasks. Operators must properly adjust the IGV speed to meet the requirements of the planned operation.
引用
收藏
页数:18
相关论文
共 50 条
  • [21] A Scheduling Framework for Railway Container Terminals Based on Internet of Vehicles
    Li, Siqiao
    Wang, Li
    2018 INTERNATIONAL SEMINAR ON COMPUTER SCIENCE AND ENGINEERING TECHNOLOGY (SCSET 2018), 2019, 1176
  • [22] Gantry Crane Scheduling with Interference Constraints in Railway Container Terminals
    Guo, Peng
    Cheng, Wenming
    Zhang, Zeqiang
    Zhang, Min
    Liang, Jian
    INTERNATIONAL JOURNAL OF COMPUTATIONAL INTELLIGENCE SYSTEMS, 2013, 6 (02) : 244 - 260
  • [23] Research on scheduling of synchronized handling operation of Railway Container Terminals
    Zhang, Qiong
    Zhu, Xiaoning
    2018 INTERNATIONAL SEMINAR ON COMPUTER SCIENCE AND ENGINEERING TECHNOLOGY (SCSET 2018), 2019, 1176
  • [24] A Hybrid Genetic-Heuristic Algorithm for Scheduling of Automated Guided Vehicles and Quay Cranes in Automated Container Terminals
    Homayouni, S. M.
    Tang, S. H.
    Ismail, N.
    Ariffin, M. K. A. M.
    Samin, R.
    CIE: 2009 INTERNATIONAL CONFERENCE ON COMPUTERS AND INDUSTRIAL ENGINEERING, VOLS 1-3, 2009, : 96 - 101
  • [25] Gantry Crane Scheduling with Interference Constraints in Railway Container Terminals
    Peng Guo
    Wenming Cheng
    Zeqiang Zhang
    Min Zhang
    Jian Liang
    International Journal of Computational Intelligence Systems, 2013, 6 : 244 - 260
  • [26] Battery-powered automated guided vehicles scheduling problem in automated container terminals for minimizing energy consumption
    Yang, Xurui
    Hu, Hongtao
    Jin, Jiangang
    OCEAN & COASTAL MANAGEMENT, 2023, 246
  • [27] Priority-based speed control strategy for automated guided vehicle path planning in automated container terminals
    Zhong, Meisu
    Yang, Yongsheng
    Sun, Shu
    Zhou, Yamin
    Postolache, Octavian
    Ge, Ying-En
    TRANSACTIONS OF THE INSTITUTE OF MEASUREMENT AND CONTROL, 2020, 42 (16) : 3079 - 3090
  • [28] Evaluation of Automated Guided Vehicle Systems for Container Terminals Using Multi Agent Based Simulation
    Henesey, Lawrence
    Davidsson, Paul
    Persson, Jan A.
    MULTI-AGENT-BASED SIMULATION IX, 2009, 5269 : 85 - +
  • [29] Scheduling cooperative twin automated stacking cranes in automated container terminals
    Han XiaoLong
    Wang Qianqian
    Huang Jiwei
    COMPUTERS & INDUSTRIAL ENGINEERING, 2019, 128 : 553 - 558
  • [30] An Adaptive Large Neighborhood Search Algorithm for Equipment Scheduling in the Railway Yard of an Automated Container Terminal
    Chen, Hongbin
    Liu, Wei
    JOURNAL OF MARINE SCIENCE AND ENGINEERING, 2024, 12 (05)