共 50 条
- [2] Integrated scheduling of handling equipment at automated container terminals [J]. Annals of Operations Research, 2008, 159 : 373 - 394
- [4] Integrated scheduling of handling operations in railway container terminals [J]. TRANSPORTATION LETTERS-THE INTERNATIONAL JOURNAL OF TRANSPORTATION RESEARCH, 2019, 11 (07): : 402 - 412
- [6] HANDLING EQUIPMENT AT CONTAINER TERMINALS [J]. TECHNISCHE MITTEILUNGEN KRUPP WERKSBERICHTE, 1970, 28 (03): : 109 - &
- [9] INTEGRATED SCHEDULING OF EQUIPMENT FOR QUAYSIDE TRANSPORT IN AUTOMATED SEAPORT CONTAINER TERMINALS [J]. TRANSPORTATION AND MANAGEMENT SCIENCE, 2008, : 719 - 727
- [10] A Heuristic Algorithm for Integrated Scheduling Problem of Container Handling System [J]. CIE: 2009 INTERNATIONAL CONFERENCE ON COMPUTERS AND INDUSTRIAL ENGINEERING, VOLS 1-3, 2009, : 40 - 45