INTEGRATED SCHEDULING OF EQUIPMENT FOR QUAYSIDE TRANSPORT IN AUTOMATED SEAPORT CONTAINER TERMINALS

被引:0
|
作者
Gujjula, R. [1 ]
Guenther, H.-O. [1 ]
机构
[1] Berlin Inst Technol, Dept Prod Management, Berlin, Germany
关键词
D O I
暂无
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Highly automated seaport container terminals like the CTA in Hamburg or the ECT in Rotterdam deploy automated guided vehicles (AGVs) to transport containers from quayside to yard and vice versa. Unlike straddle carriers or automated lifting vehicles, AGVs are not able to lift containers by themselves. They need either a quay crane or a yard crane to load and unload containers. Therefore, cranes and AGVs need synchronized schedules to avoid waiting times. Several problems have to be taken into consideration for integrated scheduling of the quayside transport: AGV dispatching, storage block assignment and yard crane scheduling. These problems occur frequently, i.e. a decision has to be made basically every second. For this reason it's necessary to find a solution for these problems within reasonable time, otherwise terminal operations will be halted until a decision will have been made. Strategies to solve these problems are usually examined by means of simulation, though it is still a major problem to benchmark these strategies. In this paper a mixed-integer linear program (MILP) is introduced which integrates AGV dispatching, storage block assignment and yard crane scheduling in order to calculate schedules for terminal equipment using ex post data. The results of the MILP can be used to benchmark real-time dispatching strategies.
引用
收藏
页码:719 / 727
页数:9
相关论文
共 50 条
  • [1] Integrated scheduling of handling equipment at automated container terminals
    Lau, Henry Y. K.
    Zhao, Ying
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2008, 112 (02) : 665 - 682
  • [2] Integrated scheduling of handling equipment at automated container terminals
    Henry Y. K. Lau
    Ying Zhao
    [J]. Annals of Operations Research, 2008, 159 : 373 - 394
  • [3] Integrated scheduling of handling equipment at automated container terminals
    Lau, Henry Y. K.
    Zhao, Ying
    [J]. ANNALS OF OPERATIONS RESEARCH, 2008, 159 (01) : 373 - 394
  • [4] Strategies for dispatching AGVs at automated seaport container terminals
    Martin Grunow
    Hans-Otto Günther
    Matthias Lehmann
    [J]. OR Spectrum, 2006, 28 : 587 - 610
  • [5] Strategies for dispatching AGVs at automated seaport container terminals
    Grunow, Martin
    Guenther, Hans-Otto
    Lehmann, Matthias
    [J]. OR SPECTRUM, 2006, 28 (04) : 587 - 610
  • [6] AGV dispatching strategies at automated seaport container terminals
    Guenther, Hans-Otto
    Grunow, Martin
    Lehmann, Matthias
    [J]. OPERATIONS RESEARCH AND ITS APPLICATIONS, 2005, 5 : 48 - 64
  • [7] An integrated scheduling method for AGV routing in automated container terminals
    Yang, Yongsheng
    Zhong, Meisu
    Dessouky, Yasser
    Postolache, Octavian
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 2018, 126 : 482 - 493
  • [8] Optimization for integrated scheduling of intelligent handling equipment with bidirectional flows and limited buffers at automated container terminals
    Zhuang, Zilong
    Zhang, Zhanluo
    Teng, Hao
    Qin, Wei
    Fang, Huaijin
    [J]. COMPUTERS & OPERATIONS RESEARCH, 2022, 145
  • [9] A mathematical formulation for integrated scheduling problem of handling equipment in container terminals
    Zheng, Yan
    Xiao, Yujie
    [J]. PROCEEDINGS OF THE 2ND INTERNATIONAL CONFERENCE ON ECONOMICS AND MANAGEMENT, EDUCATION, HUMANITIES AND SOCIAL SCIENCES (EMEHSS 2018), 2018, 151 : 538 - 543
  • [10] A job grouping approach for planning container transfers at automated seaport container terminals
    Yuan, S.
    Skinner, B. T.
    Huang, S.
    Liu, D. K.
    Dissanayake, G.
    Lau, H.
    Pagac, D.
    [J]. ADVANCED ENGINEERING INFORMATICS, 2011, 25 (03) : 413 - 426