Modeling the Interdependencies between the Risk Factors Contributing to Preconstruction Delays in Construction Projects

被引:0
|
作者
Charbel, Ghadi [1 ]
Assaad, Rayan H. [2 ,3 ]
Tejada, Tulio Rodriguez [1 ]
Karaa, Fadi [4 ]
机构
[1] New Jersey Inst Technol, John A Reif Jr Dept Civil & Environm Engn, Newark, NJ 07102 USA
[2] New Jersey Inst Technol, John A Reif Jr Dept Civil & Environm Engn, Construct & Civil Infrastruct, Newark, NJ 07102 USA
[3] New Jersey Inst Technol, John A Reif Jr Dept Civil & Environm Engn, Smart Construct & Intelligent Infrastruct Syst Lab, Newark, NJ 07102 USA
[4] New Jersey Inst Technol, John A Reif Jr Dept Civil & Environm Engn, Crit Infrastruct, Newark, NJ 07102 USA
关键词
DESIGN STRUCTURE MATRIX; AFFECTING SCHEDULE PERFORMANCE; DELPHI TECHNIQUE; APPROXIMATION; CENTRALITY; ISSUES;
D O I
10.1061/JCEMD4.COENG-15871
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
While preconstruction delays have significant ramifications on all aspects of a project, they are often overlooked. Existing research studies focused on preconstruction delay factors as isolated events without considering the interdependencies between them. This paper addresses this research gap by considering and analyzing the associations between various risk factors causing delays in the preconstruction phase. First, a list of 30 preconstruction delay risk factors was identified based on relevant literature and was validated using the Delphi technique. Second, the dependencies between the risk factors were identified by constructing a risk structure matrix (RSM) through input from a focus group of experts by following the Delphi approach. Third, the analytic hierarchy process method was applied on the obtained RSM to quantify the identified dependencies between the various risk factors by constructing a risk numerical matrix (RNM) based on a survey distributed to industry practitioners. Fourth, the relationships or correlations between the various risk factors were modeled using network analysis conducted on the obtained RNM. Finally, the key risk factors leading to preconstruction delays were determined using clustering analysis. The research findings demonstrated that the most critical preconstruction delay risk factors are (1) design changes, mistakes, errors, and omissions; and (2) conflicts among project participants. This research adds to the body of knowledge by developing a new approach that models preconstruction delay factors as an interconnected network of events rather than as independent occurrences, thus providing a better understanding of how different preconstruction delay risk factors interact with each other and how the occurrence of one risk factor can trigger other occurrences. This research motivates stakeholders to look out for preconstruction delays more actively during project planning and design and to effectively mitigate them, ultimately improving risk management strategies during the preconstruction phase of projects.
引用
收藏
页数:19
相关论文
共 50 条
  • [1] Emperical Study of Critical Risk Factors Causing Delays in Construction Projects
    Khan, Rao Aamir
    Gul, Warda
    PROCEEDINGS OF THE 2017 9TH IEEE INTERNATIONAL CONFERENCE ON INTELLIGENT DATA ACQUISITION AND ADVANCED COMPUTING SYSTEMS: TECHNOLOGY AND APPLICATIONS (IDAACS), VOL 2, 2017, : 900 - 906
  • [2] Problems Causing Delays and Risk Factors in Welding Construction Projects of Thailand
    Prateepasen, Asa
    Aumpiem, Adisak
    ENGINEERING JOURNAL-THAILAND, 2021, 25 (05): : 33 - 44
  • [3] Unsupervised machine learning for identifying key risk factors contributing to construction delays
    Al-Bataineh, Fuad
    Khatatbeh, Ahmed Ali
    Alzubi, Yazan
    ORGANIZATION TECHNOLOGY AND MANAGEMENT IN CONSTRUCTION, 2024, 16 (01): : 170 - 185
  • [4] An Investigation into the Risk of Construction Projects Delays in the UAE
    Motaleb, Omayma
    Kishk, Mohammed
    INTERNATIONAL JOURNAL OF INFORMATION TECHNOLOGY PROJECT MANAGEMENT, 2013, 4 (03) : 50 - 65
  • [5] Analysing factors affecting delays in Indian construction projects
    Doloi, Hemanta
    Sawhney, Anil
    Iyer, K. C.
    Rentala, Sameer
    INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2012, 30 (04) : 479 - 489
  • [6] Contributing Factors of Time Overrun in Public Sector Construction Projects
    Akhund, Muhammad Akram
    Imad, Hafiz Usama
    Memon, Nafees Ahmed
    Siddiqui, Fida Hussain
    Khoso, Ali Raza
    Panhwar, Abbas Ali
    ENGINEERING TECHNOLOGY & APPLIED SCIENCE RESEARCH, 2018, 8 (05) : 3369 - 3372
  • [7] An investigation into factors causing delays in highway construction projects in iraq
    Al Hadithi, Bevian I.
    3RD INTERNATIONAL CONFERENCE ON BUILDINGS, CONSTRUCTION AND ENVIRONMENTAL ENGINEERING, BCEE3-2017, 2018, 162
  • [8] Exploring the significant factors that influence delays in construction projects in Hargeisa
    Fashina, Adebayo Adeboye
    Omar, Mustafe Abdillahi
    Sheikh, Ahmed Abdullahi
    Fakunle, Funke Folasade
    HELIYON, 2021, 7 (04)
  • [9] Critical Factors and Mitigating Measures of Construction Delays of Pakistani Building Construction Projects
    Irfanullah
    Hasmori, Muhammad Fikri
    Memon, Mujtaba Hassan
    Ismail, Radzi
    INTERNATIONAL JOURNAL OF SUSTAINABLE CONSTRUCTION ENGINEERING AND TECHNOLOGY, 2023, 14 (02): : 240 - 249
  • [10] Delays in the Road Construction Projects from Risk Management Perspective
    Ghaleh, Reza Mohajeri Borje
    Pourrostam, Towhid
    Sharifloo, Naser Mansour
    Sardroud, Javad Majrouhi
    Safa, Ebrahim
    INFRASTRUCTURES, 2021, 6 (09)