Modeling the Interdependencies between the Risk Factors Contributing to Preconstruction Delays in Construction Projects

被引:0
|
作者
Charbel, Ghadi [1 ]
Assaad, Rayan H. [2 ,3 ]
Tejada, Tulio Rodriguez [1 ]
Karaa, Fadi [4 ]
机构
[1] New Jersey Inst Technol, John A Reif Jr Dept Civil & Environm Engn, Newark, NJ 07102 USA
[2] New Jersey Inst Technol, John A Reif Jr Dept Civil & Environm Engn, Construct & Civil Infrastruct, Newark, NJ 07102 USA
[3] New Jersey Inst Technol, John A Reif Jr Dept Civil & Environm Engn, Smart Construct & Intelligent Infrastruct Syst Lab, Newark, NJ 07102 USA
[4] New Jersey Inst Technol, John A Reif Jr Dept Civil & Environm Engn, Crit Infrastruct, Newark, NJ 07102 USA
关键词
DESIGN STRUCTURE MATRIX; AFFECTING SCHEDULE PERFORMANCE; DELPHI TECHNIQUE; APPROXIMATION; CENTRALITY; ISSUES;
D O I
10.1061/JCEMD4.COENG-15871
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
While preconstruction delays have significant ramifications on all aspects of a project, they are often overlooked. Existing research studies focused on preconstruction delay factors as isolated events without considering the interdependencies between them. This paper addresses this research gap by considering and analyzing the associations between various risk factors causing delays in the preconstruction phase. First, a list of 30 preconstruction delay risk factors was identified based on relevant literature and was validated using the Delphi technique. Second, the dependencies between the risk factors were identified by constructing a risk structure matrix (RSM) through input from a focus group of experts by following the Delphi approach. Third, the analytic hierarchy process method was applied on the obtained RSM to quantify the identified dependencies between the various risk factors by constructing a risk numerical matrix (RNM) based on a survey distributed to industry practitioners. Fourth, the relationships or correlations between the various risk factors were modeled using network analysis conducted on the obtained RNM. Finally, the key risk factors leading to preconstruction delays were determined using clustering analysis. The research findings demonstrated that the most critical preconstruction delay risk factors are (1) design changes, mistakes, errors, and omissions; and (2) conflicts among project participants. This research adds to the body of knowledge by developing a new approach that models preconstruction delay factors as an interconnected network of events rather than as independent occurrences, thus providing a better understanding of how different preconstruction delay risk factors interact with each other and how the occurrence of one risk factor can trigger other occurrences. This research motivates stakeholders to look out for preconstruction delays more actively during project planning and design and to effectively mitigate them, ultimately improving risk management strategies during the preconstruction phase of projects.
引用
收藏
页数:19
相关论文
共 50 条
  • [41] Risk Factors in Construction Projects during Unrest Period in Yemen
    Alashwal, Ali Mohammed
    Al-Sabahi, Mohammed Hatim
    JOURNAL OF CONSTRUCTION IN DEVELOPING COUNTRIES, 2018, 23 (02) : 43 - 62
  • [42] Assessment of risk factors on construction projects in gondar city, Ethiopia
    Tessema, Amare Tilahun
    Alene, Getachew Asefa
    Wolelaw, Natnael Melsew
    HELIYON, 2022, 8 (11)
  • [43] Identification of factors influencing communication between participants in construction projects
    Liu, Yan
    Baldwin, Rew N.
    Shen, L. Y.
    Proceedings of CRIOCM 2006 International Research Symposium on Advancement of Construction Management and Real Estate, Vols 1 and 2, 2006, : 291 - 299
  • [44] Modeling of success factors of using PU coats in concrete construction projects
    Waqar, Ahsan
    Shafiq, Nasir
    Bheel, Naraindas
    Benjeddou, Omrane
    Sor, Nadhim Hamah
    Hu, Jong Wan
    Najm, Hadee Mohammed
    Almujibah, Hamad R.
    HELIYON, 2024, 10 (07)
  • [45] Exploring the critical production risk factors for modular integrated construction projects
    Wuni, Ibrahim Yahaya
    Shen, Geoffrey Qiping
    JOURNAL OF FACILITIES MANAGEMENT, 2023, 21 (01) : 50 - 68
  • [46] Structural modelling of internal risk factors for oil and gas construction projects
    Kassem, Mukhtar A.
    Khoiry, Muhamad Azry
    Hamzah, Noraini
    INTERNATIONAL JOURNAL OF ENERGY SECTOR MANAGEMENT, 2020, 14 (05) : 975 - 1000
  • [47] Investigating the role of knowledge management on the relationship between integration management, risk factors, and performance management of construction projects
    Abudaqqa, Rawan
    Mohamed, Khairudin
    Ab-Samat, Hasnida
    JOURNAL OF PROJECT MANAGEMENT, 2024, 9 (03) : 277 - 300
  • [48] Identification of the relations between dispute factors and dispute categories in construction projects
    Ilter, Deniz
    INTERNATIONAL JOURNAL OF LAW IN THE BUILT ENVIRONMENT, 2012, 4 (01) : 45 - 59
  • [49] Determining the relationship between conflict factors and performance of international construction projects
    Al-Sibaie, Eyad
    Alashwal, Ali
    Abdul-Rahman, Hamzah
    Zolkafli, Umi
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2014, 21 (04) : 369 - +
  • [50] Factors affecting adoption of building information modeling in construction projects: A case of Vietnam
    Nguyen Van Tam
    Tran Ngoc Diep
    Nguyen Quoc Toan
    Nguyen Le Dinh Quy
    COGENT BUSINESS & MANAGEMENT, 2021, 8 (01):