Modeling the Interdependencies between the Risk Factors Contributing to Preconstruction Delays in Construction Projects

被引:0
|
作者
Charbel, Ghadi [1 ]
Assaad, Rayan H. [2 ,3 ]
Tejada, Tulio Rodriguez [1 ]
Karaa, Fadi [4 ]
机构
[1] New Jersey Inst Technol, John A Reif Jr Dept Civil & Environm Engn, Newark, NJ 07102 USA
[2] New Jersey Inst Technol, John A Reif Jr Dept Civil & Environm Engn, Construct & Civil Infrastruct, Newark, NJ 07102 USA
[3] New Jersey Inst Technol, John A Reif Jr Dept Civil & Environm Engn, Smart Construct & Intelligent Infrastruct Syst Lab, Newark, NJ 07102 USA
[4] New Jersey Inst Technol, John A Reif Jr Dept Civil & Environm Engn, Crit Infrastruct, Newark, NJ 07102 USA
关键词
DESIGN STRUCTURE MATRIX; AFFECTING SCHEDULE PERFORMANCE; DELPHI TECHNIQUE; APPROXIMATION; CENTRALITY; ISSUES;
D O I
10.1061/JCEMD4.COENG-15871
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
While preconstruction delays have significant ramifications on all aspects of a project, they are often overlooked. Existing research studies focused on preconstruction delay factors as isolated events without considering the interdependencies between them. This paper addresses this research gap by considering and analyzing the associations between various risk factors causing delays in the preconstruction phase. First, a list of 30 preconstruction delay risk factors was identified based on relevant literature and was validated using the Delphi technique. Second, the dependencies between the risk factors were identified by constructing a risk structure matrix (RSM) through input from a focus group of experts by following the Delphi approach. Third, the analytic hierarchy process method was applied on the obtained RSM to quantify the identified dependencies between the various risk factors by constructing a risk numerical matrix (RNM) based on a survey distributed to industry practitioners. Fourth, the relationships or correlations between the various risk factors were modeled using network analysis conducted on the obtained RNM. Finally, the key risk factors leading to preconstruction delays were determined using clustering analysis. The research findings demonstrated that the most critical preconstruction delay risk factors are (1) design changes, mistakes, errors, and omissions; and (2) conflicts among project participants. This research adds to the body of knowledge by developing a new approach that models preconstruction delay factors as an interconnected network of events rather than as independent occurrences, thus providing a better understanding of how different preconstruction delay risk factors interact with each other and how the occurrence of one risk factor can trigger other occurrences. This research motivates stakeholders to look out for preconstruction delays more actively during project planning and design and to effectively mitigate them, ultimately improving risk management strategies during the preconstruction phase of projects.
引用
收藏
页数:19
相关论文
共 50 条
  • [31] Identification of Success Factors in Minimizing Delays on Construction Projects in IAU-Shoushtar-Iran
    Pourrostam, Towhid
    Ismail, Amiruddin
    Mansournejad, Mahmood
    ADVANCES IN STRUCTURAL ENGINEERING, PTS 1-3, 2011, 94-96 : 2189 - +
  • [32] Investigation of critical factors affecting cost overruns and delays in Egyptian mega construction projects
    Daoud, Ahmed Osama
    El Hefnawy, Mohammed
    Wefki, Hossam
    ALEXANDRIA ENGINEERING JOURNAL, 2023, 83 : 326 - 334
  • [33] A review of artificial intelligence based risk assessment methods for capturing complexity-risk interdependencies Cost overrun in construction projects
    Afzal, Farman
    Shao Yunfei
    Nazir, Mubasher
    Bhatti, Saad Mahmood
    INTERNATIONAL JOURNAL OF MANAGING PROJECTS IN BUSINESS, 2021, 14 (02) : 300 - 328
  • [34] Critical risk factors in international construction projects An Indian perspective
    Viswanathan, Satish Kumar
    Jha, Kumar Neeraj
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2020, 27 (05) : 1169 - 1190
  • [35] Modelling the critical risk factors for modular integrated construction projects
    Wuni, Ibrahim Yahaya
    Shen, Geoffrey Qiping
    Osei-Kyei, Robert
    Agyeman-Yeboah, Stephen
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2022, 22 (11) : 2013 - 2026
  • [36] Cost and time risk factors in construction projects in the Dominican Republic
    Fernandez-Valderrama, Pedro
    Urena-Estrella, Crismal
    Moyano, Juan
    Bienvenido-Huertas, David
    FRONTIERS IN BUILT ENVIRONMENT, 2024, 10
  • [37] Significant Risk Factors in Construction Projects: Contractor's Perception
    Abd Karim, Nur Alkaf
    Abd Rahman, Ismail
    Memmon, Aftab Hameed
    Jamil, Nurhidayah
    Abd Azis, Ade Asmi
    2012 IEEE COLLOQUIUM ON HUMANITIES, SCIENCE & ENGINEERING RESEARCH (CHUSER 2012), 2012,
  • [38] Identification and analysing of risk factors affecting cost of construction projects
    Vivek, Attada
    Rao, C. H. Hanumantha
    MATERIALS TODAY-PROCEEDINGS, 2022, 60 : 1696 - 1701
  • [39] Perception of human risk factors in construction projects: An exploratory study
    Thevendran, Vicknayson
    Mawdesley, M.J.
    International Journal of Project Management, 2004, 22 (02) : 131 - 137
  • [40] Exploring the design risk factors for modular integrated construction projects
    Wuni, Ibrahim Yahaya
    Shen, Geoffrey Qiping
    Antwi-Afari, Maxwell Fordjour
    CONSTRUCTION INNOVATION-ENGLAND, 2023, 23 (01): : 213 - 228