Problems Causing Delays and Risk Factors in Welding Construction Projects of Thailand

被引:2
|
作者
Prateepasen, Asa [1 ]
Aumpiem, Adisak [2 ]
机构
[1] King Mongkuts Univ Technol Thonburi KMUTT, Fac Engn, Dept Prod Engn, Bangkok, Thailand
[2] King Mongkuts Univ Technol Thonburi KMUTT, Fac Engn, Ind & Mfg Syst Engn, Bangkok, Thailand
来源
ENGINEERING JOURNAL-THAILAND | 2021年 / 25卷 / 05期
关键词
Delay risk; Thailand; fabrication risk; welding risk; construction; MANAGEMENT; INDUSTRY;
D O I
10.4186/ej.2021.25.5.33
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Welding delays are one of the major risks in steel construction industry in Thailand. Therefore, it is essential to study and analyze the risk factors that lead to problems causing welding construction delays. This studied focused on delay risk factors in causes of construction projects collected from literature review having the different construction processes, project period, culture, countries, and amount of delay factors for contribution in welding construction projects. Questionnaire surveys and interviews were conducted on major companies connected to welding works in support of the construction projects in Thailand to survey thought problems causing delays and risk factors. Risk factors related to internal and external risk were rated among the risks identified problems. Issues such as material receiving, performance, qualified and language barriers were also highlighted in the questionnaire and during interviews. Notably, the problem such as "multilingual and multicultural" caused ineffective communication. A case study used the FMEA technique to analyze the severity, occurrences and detection, and evaluate to risk priority number. Significant risks were analyzed and compared between the Modified RPN and WRPN method for finding the "Critical risk". The new finding can contribute additional help for project managers to predict and mitigate welding construction project delays.
引用
收藏
页码:33 / 44
页数:12
相关论文
共 50 条
  • [1] Problems causing delays in major construction projects in Thailand
    Toor, Shamas-Ur-Rehman
    Ogunlana, Stephen O.
    CONSTRUCTION MANAGEMENT AND ECONOMICS, 2008, 26 (04) : 395 - 408
  • [2] Emperical Study of Critical Risk Factors Causing Delays in Construction Projects
    Khan, Rao Aamir
    Gul, Warda
    PROCEEDINGS OF THE 2017 9TH IEEE INTERNATIONAL CONFERENCE ON INTELLIGENT DATA ACQUISITION AND ADVANCED COMPUTING SYSTEMS: TECHNOLOGY AND APPLICATIONS (IDAACS), VOL 2, 2017, : 900 - 906
  • [3] An investigation into factors causing delays in highway construction projects in iraq
    Al Hadithi, Bevian I.
    3RD INTERNATIONAL CONFERENCE ON BUILDINGS, CONSTRUCTION AND ENVIRONMENTAL ENGINEERING, BCEE3-2017, 2018, 162
  • [4] A Review on Significant Factors Causing Delays in Saudi Arabia Construction Projects
    Alajmi, Abdulali Mohammed
    Memon, Zubair Ahmed
    SMART CITIES, 2022, 5 (04): : 1465 - 1487
  • [5] Main Risk Factors Causing Delays in GAP Construction Projects in Turkey by Using Relative Importance Index (RII) Method
    Abdaljader, Aseel
    Gunal, Mustafa
    IRANIAN JOURNAL OF SCIENCE AND TECHNOLOGY-TRANSACTIONS OF CIVIL ENGINEERING, 2024, 48 (02) : 611 - 633
  • [6] Main Risk Factors Causing Delays in GAP Construction Projects in Turkey by Using Relative Importance Index (RII) Method
    Aseel Abdaljader
    Mustafa Günal
    Iranian Journal of Science and Technology, Transactions of Civil Engineering, 2024, 48 : 611 - 633
  • [7] Modeling the Interdependencies between the Risk Factors Contributing to Preconstruction Delays in Construction Projects
    Charbel, Ghadi
    Assaad, Rayan H.
    Tejada, Tulio Rodriguez
    Karaa, Fadi
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2025, 151 (04)
  • [8] An Investigation into the Risk of Construction Projects Delays in the UAE
    Motaleb, Omayma
    Kishk, Mohammed
    INTERNATIONAL JOURNAL OF INFORMATION TECHNOLOGY PROJECT MANAGEMENT, 2013, 4 (03) : 50 - 65
  • [9] Aggregation of factors causing cost overruns and time delays in large public construction projects Trends and implications
    Adam, Abderisak
    Josephson, Per-Erik Bertil
    Lindahl, Goran
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2017, 24 (03) : 393 - 406
  • [10] Development of a scale for factors causing delays in infrastructure projects in India
    Edison, J. C.
    Singla, Harish Kumar
    CONSTRUCTION ECONOMICS AND BUILDING, 2020, 20 (01): : 36 - 55