Assessing the Causes and Effects of Delay and Disruption in Construction Projects in Malaysia

被引:0
|
作者
Sohu, S. [1 ]
Kassim, Tahara Ramadzan Binti Md [2 ]
Mustafa, A. [1 ]
Arshad, M. U. [3 ]
Nagapan, S. [4 ]
机构
[1] Univ Larkano, Fac Engn, Airport Rd, Larkano 77150, Sindh, Pakistan
[2] IIUM Univ, Dept Civil Engn, Kuala Lumpur, Malaysia
[3] Univ Engn & Technol, Civil & Architectural Engn Dept, Lahore, Pakistan
[4] Univ Tun Hussein Onn, Fac Civil Engn & Built Environm, Parit Raja, Malaysia
关键词
Causes; Effects; Delays Construction Projects; Disruption of a Project; SCHEDULE;
D O I
10.2478/jaes-2024-0041
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Construction projects often face challenges while execution such as delays and disruptions. Thus, Research studies are being carried out to managing the potential risks such as technical, economical, legal, social, commercial, financial, resource and construction that might arise from delays as well as from disruptions. The prime aim of this research is to identify the causes and effects on construction projects due to delays and disruptions. For the data collection, a descriptive study designed to obtain causes that effected construction projects due to delays and disruptions from regulatory bodies clients, consulting and construction firms. Relative importance index (RII) methodology is utilized for identification of important parameters related to delay and disruptions. In this study random sampling technique are utilized for selection of respondents. For data collection literature review and questionnaires survey techniques are received from respondents. The results obtained from this research study revealed that poor project management, funding problems, design changes, delay in payment to contractors, information delays, disagreement on the valuation of work done and compensation issues are identified as main causes for delays and disruptions. In addition to that, the results mentioned that, major effects include cost overrun, time overrun, negative social impact, disputes and idling resources due to delays and disruptions. The study summarizes that there are few causes that effected delays and disruptions that put projects at risk and impacted on project performance. Therefore, it is suggested that prime focus should be kept on sufficient budget of construction, timely issuing of information, design completion and rational project management skills during procurement processes for betterment.
引用
收藏
页码:336 / 341
页数:6
相关论文
共 50 条
  • [21] Causes of delay in offshore wind turbine construction projects
    Lerche, Jon
    Lindhard, Soren
    Enevoldsen, Peter
    Neve, Hasse H.
    Moller, Dan Eggert
    Jacobsen, Emil L.
    Teizer, Jochen
    Wandahl, Soren
    PRODUCTION PLANNING & CONTROL, 2022,
  • [22] Causes of Delay in the Planning and Design Phases for Construction Projects
    Yang, Jyh-Bin
    Wei, Pei-Rei
    JOURNAL OF ARCHITECTURAL ENGINEERING, 2010, 16 (02) : 80 - 83
  • [23] Analysis of Causes of Delay and Time Performance in Construction Projects
    Gonzalez, Pablo
    Gonzalez, Vicente
    Molenaar, Keith
    Orozco, Francisco
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2014, 140 (01)
  • [24] Causes of Delay in Various Construction Projects: A Literature Review
    Mbala, Mbuyamba
    Aigbavboa, Clinton
    Aliu, John
    ADVANCES IN HUMAN FACTORS, SUSTAINABLE URBAN PLANNING AND INFRASTRUCTURE, 2019, 788 : 489 - 495
  • [25] Revisiting critical delay factors for construction: Analysing projects in Malaysia
    Yap, Jeffrey Boon Hui
    Goay, Pei Ling
    Woon, Yoke Bee
    Skitmore, Martin
    ALEXANDRIA ENGINEERING JOURNAL, 2021, 60 (01) : 1717 - 1729
  • [26] The significant factors causing delay of building construction projects in Malaysia
    Alaghbari, Wa'el
    Kadir, Mohd. Razali A.
    Salim, Azizah
    Ernawati
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2007, 14 (02) : 192 - +
  • [27] CAUSES AND EFFECTS OF VARIATIONS ON CONSTRUCTION PROJECTS
    Jayawardena, Nishadi
    Ramachandra, Thanuja
    Rotimi, James
    SUSTAINABLE SOLUTIONS IN STRUCTURAL ENGINEERING AND CONSTRUCTION, 2014, : 483 - 488
  • [28] Delay causes in Kazakhstan's construction projects and remedial measures
    Hossain, Md Aslam
    Raiymbekov, Dinmukhambet
    Nadeem, Abid
    Kim, Jong Ryeol
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2022, 22 (05) : 801 - 819
  • [29] Analysis of causes of delay in Indian construction projects and mitigation measures
    Prasad, K. V.
    Vasugi, V.
    Venkatesan, R.
    Bhat, Nikhil
    JOURNAL OF FINANCIAL MANAGEMENT OF PROPERTY AND CONSTRUCTION, 2019, 24 (01) : 58 - 78
  • [30] Risk matrix for delay causes in building construction projects in KSA
    Alfraidi, Yahya Nasser
    INTERNATIONAL JOURNAL OF ADVANCED AND APPLIED SCIENCES, 2018, 5 (06): : 93 - 97