Causes of delay in offshore wind turbine construction projects

被引:0
|
作者
Lerche, Jon [1 ]
Lindhard, Soren [2 ]
Enevoldsen, Peter [1 ]
Neve, Hasse H. [3 ]
Moller, Dan Eggert [2 ]
Jacobsen, Emil L. [3 ]
Teizer, Jochen [3 ]
Wandahl, Soren [3 ]
机构
[1] Aarhus Univ, Dept Business Dev & Technol, Birk Ctr Pk 15, DK-7400 Herning, Denmark
[2] Aalborg Univ, Dept Built Environm, Aalborg, Denmark
[3] Aarhus Univ, Dept Engn, Aarhus, Denmark
关键词
Construction management; delay; on-site assembly; offshore wind;
D O I
暂无
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This research investigated the causes of delays in offshore wind projects, categorizing, and ranking these factors using statistical analysis. The study presented was based on the analysis of 208,140 historical data points from seven different cases, investigating both the onshore and offshore on-site assembly locations. The findings revealed that the dominant delay factor is 'planning' at the onshore assembly location and 'previous task' at the offshore assembly location. This challenges the current perception that weather is the dominant cause of delay in offshore wind projects. This analysis and its results categorize and rank delay factors between on-site assembly locations, proffering a better understanding and insights into this domain. This is relevant to both academics and practitioners, not only in on- and off-shore wind projects but also in other project types handling remote or multiple assembly locations.
引用
收藏
页数:14
相关论文
共 50 条
  • [1] Causes of delay in offshore wind turbine construction projects
    Lerche, Jon
    Lindhard, Soren
    Enevoldsen, Peter
    Neve, Hasse H.
    Moller, Dan Eggert
    Jacobsen, Emil L.
    Teizer, Jochen
    Wandahl, Soren
    PRODUCTION PLANNING & CONTROL, 2023, 34 (15) : 1513 - 1526
  • [2] Review of Delay Causes in Construction Projects
    AlGheth, Abdulhamid
    Sayuti, Md Ishak
    PROCEEDINGS OF AICCE'19: TRANSFORMING THE NATION FOR A SUSTAINABLE TOMORROW, 2020, 53 : 429 - 437
  • [3] Causes of delay in construction projects in Oman
    Umar, Tariq
    MIDDLE EAST JOURNAL OF MANAGEMENT, 2018, 5 (02) : 121 - 136
  • [4] Causes of Delay in Road Construction Projects
    Mahamid, Ibrahim
    Bruland, Amund
    Dmaidi, Nabil
    JOURNAL OF MANAGEMENT IN ENGINEERING, 2012, 28 (03) : 300 - 310
  • [5] Causes of delay in large construction projects
    Construction Engineering and Management Department, King Fahd University of Petroleum and Minerals, Box # 680, Dhahran, 31261, Saudi Arabia
    Int. J. Proj. Manage., 2006, 4 (349-357):
  • [6] CAUSES OF DELAY IN LARGE BUILDING CONSTRUCTION PROJECTS
    ASSAF, SA
    ALKHALIL, M
    ALHAZMI, M
    JOURNAL OF MANAGEMENT IN ENGINEERING, 1995, 11 (02) : 45 - 50
  • [7] Analyzing delay causes in Egyptian construction projects
    Marzouk, Mohamed M.
    El-Rasas, Tarek I.
    JOURNAL OF ADVANCED RESEARCH, 2014, 5 (01) : 49 - 55
  • [8] Causes of Delay in the Construction Projects of Subway Tunnel
    Zhang, Dingbang
    Zhang, Hang
    Cheng, Tao
    ADVANCES IN CIVIL ENGINEERING, 2020, 2020
  • [9] Causes of Delay in Road Construction Projects in Afghanistan
    Kivrak, Serkan
    Baha, Mohammad Yonis
    JOURNAL OF SCIENTIFIC & INDUSTRIAL RESEARCH, 2024, 83 (01): : 46 - 57
  • [10] Causes of Delay in Smart and Complex Construction Projects
    Radman, Kambiz
    Babaeian Jelodar, Mostafa
    Ghazizadeh, Eghbal
    Wilkinson, Suzanne
    JOURNAL OF LEGAL AFFAIRS AND DISPUTE RESOLUTION IN ENGINEERING AND CONSTRUCTION, 2021, 13 (04)