Revisiting critical delay factors for construction: Analysing projects in Malaysia

被引:58
|
作者
Yap, Jeffrey Boon Hui [1 ]
Goay, Pei Ling [1 ]
Woon, Yoke Bee [1 ]
Skitmore, Martin [2 ]
机构
[1] Univ Tunku Abdul Rahman, Lee Kong Chian Fac Engn & Sci, Sungai Long Campus, Kajang 43000, Malaysia
[2] Queensland Univ Technol, Sch Built Environm, Fac Sci & Engn, Brisbane, Qld, Australia
关键词
Construction industry; Developing countries; Project management; Schedule delays; Delay factors; CRITICAL SUCCESS FACTORS; COST OVERRUNS; CAUSATIVE FACTORS; FAILURE FACTORS; DESIGN CHANGES; MANAGEMENT; TIME; MITIGATION; RANKING;
D O I
10.1016/j.aej.2020.11.021
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Although construction delays have been subjected to a considerable amount of research, this perennial problem continues to plague the construction industry globally. For this reason, this study contributes to the theory and practice of construction schedule management by identifying the primary delay causes of construction projects and uncovering the underlying factors involved. Following a meta-analysis of 52 common causes of delay identified from the literature review, 20 highly-cited causes are categorised under client-, contractor-, consultant-, labour and equipment-, material- and others-related. A field survey was employed to acquire the views of 148 Malaysian construction practitioners from client, consultant and contractor organisations. These causes are prioritised according to an importance index that integrates both frequency and severity indices, identifying the five leading causes as lack of proper planning and scheduling, too many change orders by clients, lack of competent site management and supervision, lack of competent subcontractors and financial problems of contractors. Spearman's rank correlation tests reveal a good consensus between the respondent groups to further corroborate the findings. A factor analysis identifies the five principal managerial capabilities influencing schedule delays to be competency management, communication and coordination management, financial management, risk management and site management. These findings are helpful for the praxis of critical reflection in the planning and management of production in construction. This study provides the international construction community with valuable insights to revaluate delay factors and realign project management strategies to ensure the timely delivery of projects. (C) 2020 The Authors. Published by Elsevier B.V. on behalf of Faculty of Engineering, Alexandria University.
引用
收藏
页码:1717 / 1729
页数:13
相关论文
共 50 条
  • [1] Analysing the critical delay factors and delay in material supply for construction projects in India
    Reddy, M. Vidyasagar
    Rao, Hanumantha
    MATERIALS TODAY-PROCEEDINGS, 2022, 60 : 1890 - 1897
  • [2] Critical cost factors of building construction projects in Malaysia
    Toh, Tien-Choon
    Ting, Connie
    Ali, Kherun-Nita
    Aliagha, Godwin-Uche
    Munir, Omar
    INTERNATIONAL CONFERENCE ON ASIA PACIFIC BUSINESS INNOVATION AND TECHNOLOGY MANAGEMENT, 2012, 57 : 360 - 367
  • [3] The significant factors causing delay of building construction projects in Malaysia
    Alaghbari, Wa'el
    Kadir, Mohd. Razali A.
    Salim, Azizah
    Ernawati
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2007, 14 (02) : 192 - +
  • [4] Causes of Construction Delay for Housing Projects in Malaysia
    Ramli, M. Z.
    Nordin, A.
    Roslin, N. T.
    Hamid, N. B.
    Azman, N. S.
    Zahari, N. M.
    5TH INTERNATIONAL CONFERENCE ON GREEN DESIGN AND MANUFACTURE 2019 (ICONGDM 2019), 2019, 2129
  • [5] Analysing causal relationships between delay factors in construction projects A case study of Iran
    Rezaee, Mustafa Jahangoshai
    Yousefi, Samuel
    Chakrabortty, Ripon K.
    INTERNATIONAL JOURNAL OF MANAGING PROJECTS IN BUSINESS, 2021, 14 (02) : 412 - 444
  • [6] Analysis and prioritisation of critical delay factors in construction projects: A Colombian case
    Ovalle, Oscar Rubiano
    Correa-Cepeda, Daniela
    Estrada-Cifuentes, Juan P.
    Mopan, Yesid Anacona
    ORGANIZATION TECHNOLOGY AND MANAGEMENT IN CONSTRUCTION, 2024, 16 (01): : 237 - 250
  • [7] Critical Factors behind Construction Delay in Petrochemical Projects in Saudi Arabia
    Alhajri, Abdullah Rasheed
    Alshibani, Adel
    ENERGIES, 2018, 11 (07):
  • [8] Analysing critical risk factors of Indian road construction projects: a fuzzy DEMATEL approach
    Tiwari, Anubhav
    Singh, Shailender
    Routroy, Srikanta
    Gopinath, Athira
    Sahu, Prasanta K.
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2024,
  • [9] Critical Delay Factors in Typical Physical Projects: The Case of the Ministry of Home Affairs in Malaysia
    Aminorlah, Aishatul Izwani
    Abd Rahim, Noorlizawati
    Mohamed, Zainai
    Mazlan, Ain Naadia
    JOURNAL OF CONSTRUCTION IN DEVELOPING COUNTRIES, 2023, 28 (02) : 57 - 79
  • [10] Analysing factors affecting delays in Indian construction projects
    Doloi, Hemanta
    Sawhney, Anil
    Iyer, K. C.
    Rentala, Sameer
    INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2012, 30 (04) : 479 - 489