Revisiting critical delay factors for construction: Analysing projects in Malaysia

被引:58
|
作者
Yap, Jeffrey Boon Hui [1 ]
Goay, Pei Ling [1 ]
Woon, Yoke Bee [1 ]
Skitmore, Martin [2 ]
机构
[1] Univ Tunku Abdul Rahman, Lee Kong Chian Fac Engn & Sci, Sungai Long Campus, Kajang 43000, Malaysia
[2] Queensland Univ Technol, Sch Built Environm, Fac Sci & Engn, Brisbane, Qld, Australia
关键词
Construction industry; Developing countries; Project management; Schedule delays; Delay factors; CRITICAL SUCCESS FACTORS; COST OVERRUNS; CAUSATIVE FACTORS; FAILURE FACTORS; DESIGN CHANGES; MANAGEMENT; TIME; MITIGATION; RANKING;
D O I
10.1016/j.aej.2020.11.021
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Although construction delays have been subjected to a considerable amount of research, this perennial problem continues to plague the construction industry globally. For this reason, this study contributes to the theory and practice of construction schedule management by identifying the primary delay causes of construction projects and uncovering the underlying factors involved. Following a meta-analysis of 52 common causes of delay identified from the literature review, 20 highly-cited causes are categorised under client-, contractor-, consultant-, labour and equipment-, material- and others-related. A field survey was employed to acquire the views of 148 Malaysian construction practitioners from client, consultant and contractor organisations. These causes are prioritised according to an importance index that integrates both frequency and severity indices, identifying the five leading causes as lack of proper planning and scheduling, too many change orders by clients, lack of competent site management and supervision, lack of competent subcontractors and financial problems of contractors. Spearman's rank correlation tests reveal a good consensus between the respondent groups to further corroborate the findings. A factor analysis identifies the five principal managerial capabilities influencing schedule delays to be competency management, communication and coordination management, financial management, risk management and site management. These findings are helpful for the praxis of critical reflection in the planning and management of production in construction. This study provides the international construction community with valuable insights to revaluate delay factors and realign project management strategies to ensure the timely delivery of projects. (C) 2020 The Authors. Published by Elsevier B.V. on behalf of Faculty of Engineering, Alexandria University.
引用
收藏
页码:1717 / 1729
页数:13
相关论文
共 50 条
  • [11] Assessing the Causes and Effects of Delay and Disruption in Construction Projects in Malaysia
    Sohu, S.
    Kassim, Tahara Ramadzan Binti Md
    Mustafa, A.
    Arshad, M. U.
    Nagapan, S.
    JOURNAL OF APPLIED ENGINEERING SCIENCES, 2024, 14 (02) : 336 - 341
  • [12] Analysing delay factors in construction projects using Z-number approach: insights from Pakistan
    Nadeem, Muhammad
    Jiskani, Izhar Mithal
    Urwat, Muhammad Salman
    Uddin, Salah
    Akhtar, Kamran
    Khokhar, Nadar Hussain
    CANADIAN JOURNAL OF CIVIL ENGINEERING, 2023, 50 (12) : 966 - 983
  • [13] Analysing delay causes and effects in Ghanaian state housing construction projects
    Amoatey, Charles Teye
    Ameyaw, Yaa Asabea
    Adaku, Ebenezer
    Famiyeh, Samuel
    INTERNATIONAL JOURNAL OF MANAGING PROJECTS IN BUSINESS, 2015, 8 (01) : 198 - 214
  • [14] Critical Safety Factors in Construction Projects
    Heravi, Gholamreza
    Rafsanjani, Hamed Nabizadeh
    ADVANCES IN CIVIL ENGINEERING, PTS 1-6, 2011, 255-260 : 3921 - +
  • [15] Critical Success Factors For Construction Projects
    Esmaeili, Behzad
    Pellicer, Eugenio
    Molenaar, Keith Robert
    PROJECT MANAGEMENT AND ENGINEERING RESEARCH, 2014, 2016, : 3 - 14
  • [16] CRITICAL SUCCESS FACTORS FOR CONSTRUCTION PROJECTS
    SANVIDO, V
    GROBLER, F
    PARFITT, K
    GUVENIS, M
    COYLE, M
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1992, 118 (01): : 94 - 111
  • [17] Evaluating the critical safety factors causing accidents in downstream oil and gas construction projects in Malaysia
    Waqar, Ahsan
    Othman, Idris
    Shafiq, Nasir
    Mansoor, Muhammad Shoaib
    AIN SHAMS ENGINEERING JOURNAL, 2024, 15 (01)
  • [18] Analysing significance of key quality factors for management of construction projects
    Ljevo, Zanesa
    Vukomanovic, Mladen
    Rustempasic, Nerman
    GRADEVINAR, 2017, 69 (05): : 359 - 366
  • [19] Identification and analysing of risk factors affecting cost of construction projects
    Vivek, Attada
    Rao, C. H. Hanumantha
    MATERIALS TODAY-PROCEEDINGS, 2022, 60 : 1696 - 1701
  • [20] Critical success factors of infrastructure construction projects
    Yamany, Mohamed S.
    Abdelhameed, Abdelnaser
    Elbeltagi, Emad
    Mohamed, Hany Abd Elshakour
    INNOVATIVE INFRASTRUCTURE SOLUTIONS, 2024, 9 (04)