Seru scheduling problem with lot streaming and worker transfers: A multi-objective approach

被引:1
|
作者
Yilmaz, Beren Gursoy [1 ,2 ]
Yilmaz, Omer Faruk [3 ,4 ]
Akcali, Elif [2 ]
Cevikcan, Emre [1 ]
机构
[1] Istanbul Tech Univ, Dept Ind Engn, TR-34367 Istanbul, Turkiye
[2] Univ Florida, Dept Ind & Syst Engn, Supply Chain & Logist Engn Lab, Gainesville, FL 32611 USA
[3] Karadeniz Tech Univ, Dept Ind Engn, TR-61080 Trabzon, Turkiye
[4] Univ Florida, Ctr Appl Optimizat, Dept Ind & Syst Engn, Gainesville, FL USA
关键词
Seru production system; Lot streaming; Worker transfers; Shojinka; Flexible staffing; Multi-objective modeling; NSGA-II algorithm; ASSEMBLY-LINE; SYSTEMS;
D O I
10.1016/j.cor.2024.106967
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
Seru production system (SPS) offers the flexibility of job shop production environments with the efficiency of traditional assembly lines. The SPSs are particularly attractive to industries characterized by high product variety and micro production volumes, and effective utilization of production and workforce resources is a critical challenge for SPSs. This paper addresses the seru scheduling problem with lot streaming and worker transfers for a SPS using a multi-objective approach. To this end, first, a multi-objective mixed-integer linear programming (MILP) model is developed for the minimization of makespan, average flow time, and maximum workload imbalance. Six different algorithms based on non-dominating sorting genetic algorithm II (NSGA-II) are developed, each corresponding to an operational setting dictated by the lot streaming and worker transfers strategies in effect. A design of experiment (DoE) framework is utilized to generate realistic problem instances based on the several controllable factors and their levels. Analysis of comprehensive computational results demonstrates the effectiveness of the proposed algorithm (NS2) in finding high-quality and diversified solutions by simultaneous utilization of lot streaming with variable-sized sublots and worker transfers. The results indicate that the performance improvement achieved by the NS2 ranges between 10% and 20% compared to other algorithms. Furthermore, Analysis of Variance (ANOVA) confirms the significance of the number of workers and number of serus as critical parameters for the design or redesign of SPSs. Drawing on these findings, managerial insights are provided regarding the impact of lot streaming and worker transfers on SPS performance. This study offers practical and theoretical insights for decision-makers seeking to enhance SPS performance and bridge the gap between the conceptual analysis and practical implementation of SPSs.
引用
收藏
页数:25
相关论文
共 50 条
  • [1] Multi-objective lot Streaming hybrid flowshop scheduling with missing Operations
    Li, Haoping
    Zhu, Chengbiao
    Chen, Xinyi
    Peng, Wei
    Meng, Ronghua
    Jin, Zhuhong
    Du, Xinyi
    Cm, Liuyang
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2025, 31 (01): : 89 - 101
  • [2] Production lot-streaming flow shop scheduling problem based on multi-objective optimization algorithm
    Wang, Jinjun
    Academic Journal of Manufacturing Engineering, 2019, 17 (02): : 124 - 129
  • [3] A Multi-objective Hybrid Discrete Harmony Search Algorithm for Lot-Streaming Flow Shop Scheduling Problem
    Han, Hong-Yan
    ADVANCED INTELLIGENT COMPUTING THEORIES AND APPLICATIONS: WITH ASPECTS OF ARTIFICIAL INTELLIGENCE, 2012, 6839 : 66 - 73
  • [4] An improved NSGA-II algorithm for multi-objective lot-streaming flow shop scheduling problem
    Han, Yu-Yan
    Gong, Dun-wei
    Sun, Xiao-Yan
    Pan, Quan-Ke
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2014, 52 (08) : 2211 - 2231
  • [5] A Two-Stage Multi-Objective Genetic Algorithm for a Flexible Job Shop Scheduling Problem with Lot Streaming
    Rooyani, Danial
    Defersha, Fantahun
    ALGORITHMS, 2022, 15 (07)
  • [6] A multi-objective evolutionary algorithm for the hybrid flowshop rescheduling problem with lot streaming
    Zhang, Biao
    Meng, Leilei
    Zhang, Xinli
    PROCEEDINGS OF THE 33RD CHINESE CONTROL AND DECISION CONFERENCE (CCDC 2021), 2021, : 5163 - 5168
  • [7] A MULTI-OBJECTIVE LOT-STREAMING OPTIMIZATION SCHEDULING MODEL CONSIDERING THE BLOCKING EFFECT
    Li, Y. G.
    Zhang, M. S.
    INTERNATIONAL JOURNAL OF SIMULATION MODELLING, 2017, 16 (04) : 731 - 741
  • [8] A Modified Migrating Birds Optimization for Multi-Objective Lot Streaming Hybrid Flowshop Scheduling
    Tang H.
    Wang D.
    Shao Y.
    Zhao W.
    Jiang W.
    Chen Q.
    Shanghai Jiaotong Daxue Xuebao/Journal of Shanghai Jiaotong University, 2022, 56 (02): : 201 - 213
  • [9] Lot streaming in workforce scheduling problem for seru production system under Shojinka philosophy
    Yilmaz, Beren Gursoy
    Yilmaz, Omer Faruk
    Cevikcan, Emre
    COMPUTERS & INDUSTRIAL ENGINEERING, 2023, 185
  • [10] Multi-objective optimization of energy-efficient remanufacturing system scheduling problem with lot-streaming production mode
    Tian, Guangdong
    Wang, Wenjie
    Zhang, Honghao
    Zhou, Xiaowan
    Zhang, Cheng
    Li, Zhiwu
    EXPERT SYSTEMS WITH APPLICATIONS, 2024, 237