Seru scheduling problem with lot streaming and worker transfers: A multi-objective approach

被引:1
|
作者
Yilmaz, Beren Gursoy [1 ,2 ]
Yilmaz, Omer Faruk [3 ,4 ]
Akcali, Elif [2 ]
Cevikcan, Emre [1 ]
机构
[1] Istanbul Tech Univ, Dept Ind Engn, TR-34367 Istanbul, Turkiye
[2] Univ Florida, Dept Ind & Syst Engn, Supply Chain & Logist Engn Lab, Gainesville, FL 32611 USA
[3] Karadeniz Tech Univ, Dept Ind Engn, TR-61080 Trabzon, Turkiye
[4] Univ Florida, Ctr Appl Optimizat, Dept Ind & Syst Engn, Gainesville, FL USA
关键词
Seru production system; Lot streaming; Worker transfers; Shojinka; Flexible staffing; Multi-objective modeling; NSGA-II algorithm; ASSEMBLY-LINE; SYSTEMS;
D O I
10.1016/j.cor.2024.106967
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
Seru production system (SPS) offers the flexibility of job shop production environments with the efficiency of traditional assembly lines. The SPSs are particularly attractive to industries characterized by high product variety and micro production volumes, and effective utilization of production and workforce resources is a critical challenge for SPSs. This paper addresses the seru scheduling problem with lot streaming and worker transfers for a SPS using a multi-objective approach. To this end, first, a multi-objective mixed-integer linear programming (MILP) model is developed for the minimization of makespan, average flow time, and maximum workload imbalance. Six different algorithms based on non-dominating sorting genetic algorithm II (NSGA-II) are developed, each corresponding to an operational setting dictated by the lot streaming and worker transfers strategies in effect. A design of experiment (DoE) framework is utilized to generate realistic problem instances based on the several controllable factors and their levels. Analysis of comprehensive computational results demonstrates the effectiveness of the proposed algorithm (NS2) in finding high-quality and diversified solutions by simultaneous utilization of lot streaming with variable-sized sublots and worker transfers. The results indicate that the performance improvement achieved by the NS2 ranges between 10% and 20% compared to other algorithms. Furthermore, Analysis of Variance (ANOVA) confirms the significance of the number of workers and number of serus as critical parameters for the design or redesign of SPSs. Drawing on these findings, managerial insights are provided regarding the impact of lot streaming and worker transfers on SPS performance. This study offers practical and theoretical insights for decision-makers seeking to enhance SPS performance and bridge the gap between the conceptual analysis and practical implementation of SPSs.
引用
收藏
页数:25
相关论文
共 50 条
  • [31] Multi-Objective Lot-Sizing and Scheduling Dealing with Perishability Issues
    Amorim, Pedro
    Antunes, Carlos H.
    Almada-Lobo, Bernardo
    INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, 2011, 50 (06) : 3371 - 3381
  • [32] Multi-objective flexible Job Shop scheduling with lot-splitting
    Bai, Jun-Jie
    Gong, Yi-Guang
    Wang, Ning-Sheng
    Tang, Dun-Bing
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2010, 16 (02): : 396 - 403
  • [33] An Improved Multi-Objective Evolutionary Approach for Aerospace Shell Production Scheduling Problem
    Wang, Qing
    Wang, Xiaoshuang
    Luo, Haiwei
    Xiong, Jian
    SYMMETRY-BASEL, 2020, 12 (04):
  • [34] An Optimization Approach to Solve a Multi-objective Unrelated Parallel Machine Scheduling Problem
    Sadeghi, S.
    Ariafar, Sh.
    Ghanbari, M.
    Ismail, N.
    ADVANCES IN MECHANICAL AND MANUFACTURING ENGINEERING, 2014, 564 : 585 - +
  • [35] A multi-objective approach for robust airline scheduling
    Burke, Edmund K.
    De Causmaecker, Patrick
    De Maere, Geert
    Mulder, Jeroen
    Paelinck, Marc
    Vanden Berghe, Greet
    COMPUTERS & OPERATIONS RESEARCH, 2010, 37 (05) : 822 - 832
  • [36] A multi-objective evolutionary approach for generator scheduling
    Li, Dapeng
    Das, Sanjoy
    Pahwa, Anil
    Deb, Kalyanmoy
    EXPERT SYSTEMS WITH APPLICATIONS, 2013, 40 (18) : 7647 - 7655
  • [37] Hybridizing a multi-objective simulated annealing algorithm with a multi-objective evolutionary algorithm to solve a multi-objective project scheduling problem
    Yannibelli, Virginia
    Amandi, Analia
    EXPERT SYSTEMS WITH APPLICATIONS, 2013, 40 (07) : 2421 - 2434
  • [38] Multi-Objective Memetic Search Algorithm for Multi-Objective Permutation Flow Shop Scheduling Problem
    Li, Xiangtao
    Ma, Shijing
    IEEE ACCESS, 2016, 4 : 2154 - 2165
  • [39] Multi-objective evolutionary algorithms with heuristic decoding for hybrid flow shop scheduling problem with worker constraint
    Han, Wenwu
    Deng, Qianwang
    Gong, Guiliang
    Zhang, Like
    Luo, Qiang
    EXPERT SYSTEMS WITH APPLICATIONS, 2021, 168 (168)
  • [40] Hybrid heuristic algorithm for multi-objective scheduling problem
    Peng Jian'gang
    Liu Mingzhou
    Zhang Xi
    Ling Lin
    JOURNAL OF SYSTEMS ENGINEERING AND ELECTRONICS, 2019, 30 (02) : 327 - 342