Seru scheduling problem with lot streaming and worker transfers: A multi-objective approach

被引:1
|
作者
Yilmaz, Beren Gursoy [1 ,2 ]
Yilmaz, Omer Faruk [3 ,4 ]
Akcali, Elif [2 ]
Cevikcan, Emre [1 ]
机构
[1] Istanbul Tech Univ, Dept Ind Engn, TR-34367 Istanbul, Turkiye
[2] Univ Florida, Dept Ind & Syst Engn, Supply Chain & Logist Engn Lab, Gainesville, FL 32611 USA
[3] Karadeniz Tech Univ, Dept Ind Engn, TR-61080 Trabzon, Turkiye
[4] Univ Florida, Ctr Appl Optimizat, Dept Ind & Syst Engn, Gainesville, FL USA
关键词
Seru production system; Lot streaming; Worker transfers; Shojinka; Flexible staffing; Multi-objective modeling; NSGA-II algorithm; ASSEMBLY-LINE; SYSTEMS;
D O I
10.1016/j.cor.2024.106967
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
Seru production system (SPS) offers the flexibility of job shop production environments with the efficiency of traditional assembly lines. The SPSs are particularly attractive to industries characterized by high product variety and micro production volumes, and effective utilization of production and workforce resources is a critical challenge for SPSs. This paper addresses the seru scheduling problem with lot streaming and worker transfers for a SPS using a multi-objective approach. To this end, first, a multi-objective mixed-integer linear programming (MILP) model is developed for the minimization of makespan, average flow time, and maximum workload imbalance. Six different algorithms based on non-dominating sorting genetic algorithm II (NSGA-II) are developed, each corresponding to an operational setting dictated by the lot streaming and worker transfers strategies in effect. A design of experiment (DoE) framework is utilized to generate realistic problem instances based on the several controllable factors and their levels. Analysis of comprehensive computational results demonstrates the effectiveness of the proposed algorithm (NS2) in finding high-quality and diversified solutions by simultaneous utilization of lot streaming with variable-sized sublots and worker transfers. The results indicate that the performance improvement achieved by the NS2 ranges between 10% and 20% compared to other algorithms. Furthermore, Analysis of Variance (ANOVA) confirms the significance of the number of workers and number of serus as critical parameters for the design or redesign of SPSs. Drawing on these findings, managerial insights are provided regarding the impact of lot streaming and worker transfers on SPS performance. This study offers practical and theoretical insights for decision-makers seeking to enhance SPS performance and bridge the gap between the conceptual analysis and practical implementation of SPSs.
引用
收藏
页数:25
相关论文
共 50 条
  • [41] Multi-objective scheduling and a resource allocation problem in hospitals
    Silvija Vlah Jerić
    José Rui Figueira
    Journal of Scheduling, 2012, 15 : 513 - 535
  • [42] Hybrid heuristic algorithm for multi-objective scheduling problem
    PENG Jian’gang
    LIU Mingzhou
    ZHANG Xi
    LING Lin
    Journal of Systems Engineering and Electronics, 2019, 30 (02) : 327 - 342
  • [43] Multi-objective reentrant scheduling problem for semiconductor workshop
    Zhu G.
    Jia H.
    Huazhong Keji Daxue Xuebao (Ziran Kexue Ban)/Journal of Huazhong University of Science and Technology (Natural Science Edition), 2023, 51 (02): : 122 - 130
  • [44] Evolutionary Multi-Objective Optimization for Nurse Scheduling Problem
    Sharif, Omid
    Uenveren, Ahmet
    Acan, Adnan
    2009 FIFTH INTERNATIONAL CONFERENCE ON SOFT COMPUTING, COMPUTING WITH WORDS AND PERCEPTIONS IN SYSTEM ANALYSIS, DECISION AND CONTROL, 2010, : 144 - 147
  • [45] Multi-objective scheduling and a resource allocation problem in hospitals
    Jeric, Silvija Vlah
    Figueira, Jose Rui
    JOURNAL OF SCHEDULING, 2012, 15 (05) : 513 - 535
  • [46] A multi-objective scatter search for the ladle scheduling problem
    Tan, Yuanyuan
    Cheng, T. C. E.
    Ji, Min
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2014, 52 (24) : 7513 - 7528
  • [47] A Fuzzy Simulated Evolution Algorithm for Multi-Objective Homecare Worker Scheduling
    Mutingi, M.
    Mbohwa, C.
    2013 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM 2013), 2013, : 586 - 590
  • [48] An order scheduling problem in seru production system considering worker assignment
    Wang Y.
    Zhang Z.
    Yin Y.
    Zhang, Zhe (zhangzhe@njust.edu.cn), 1600, Inderscience Publishers (37): : 149 - 167
  • [49] Simulation study on multi-objective blocking lot streaming flow shop scheduling based on improved artificial bee colony algorithm
    Yang, Gaizhen
    Academic Journal of Manufacturing Engineering, 2019, 17 (03): : 173 - 182
  • [50] A novel hybrid multi-objective artificial bee colony algorithm for blocking lot-streaming flow shop scheduling problems
    Gong, Dunwei
    Han, Yuyan
    Sun, Jianyong
    KNOWLEDGE-BASED SYSTEMS, 2018, 148 : 115 - 130