A Two-Stage Multi-Objective Genetic Algorithm for a Flexible Job Shop Scheduling Problem with Lot Streaming

被引:4
|
作者
Rooyani, Danial [1 ]
Defersha, Fantahun [1 ]
机构
[1] Univ Guelph, Sch Engn, Guelph, ON N1G 2W1, Canada
基金
加拿大自然科学与工程研究理事会;
关键词
flexible job shop scheduling; lot streaming; multi-objective optimization; two-stage genetic algorithm; parallel computation; MIGRATING BIRDS OPTIMIZATION; POPULATION INITIALIZATION METHOD; BEE COLONY ALGORITHM; EVOLUTIONARY ALGORITHM; COMPLETION-TIME; FLOWSHOP; MINIMIZE; SETUPS;
D O I
10.3390/a15070246
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
The work in this paper is motivated by a recently published article in which the authors developed an efficient two-stage genetic algorithm for a comprehensive model of a flexible job-shop scheduling problem (FJSP). In this paper, we extend the application of the algorithm to solve a lot streaming problem in FJSP while at the same time expanding the model to incorporate multiple objectives. The objective function terms included in our current work are the minimization of the (1) makespan, (2) maximum sublot flowtime, (3) total sublot flow time, (4) maximum job flowtime, (5) total job flow time, (6) maximum sublot finish-time separation, (7) total sublot finish-time separation, (8) maximum machine load, (9) total machine load, and (10) maximum machine load difference. Numerical examples are presented to illustrate the greater need for multi-objective optimization in larger problems, the interaction of the various objective function terms, and their relevance in providing better solution quality. The ability of the two-stage genetic algorithm to jointly optimize all the objective function terms is also investigated. The results show that the algorithm can generate initial solutions that are highly improved in all of the objective function terms. It also outperforms the regular genetic algorithm in convergence speed and final solution quality in solving the multi-objective FJSP lot streaming. We also demonstrate that high-performance parallel computation can further improve the performance of the two-stage genetic algorithm. Nevertheless, the sequential two-stage genetic algorithm with a single CPU outperforms the parallel regular genetic algorithm that uses many CPUs, asserting the superiority of the two-stage genetic algorithm in solving the proposed multi-objective FJSP lot streaming.
引用
收藏
页数:42
相关论文
共 50 条
  • [1] A two-stage genetic algorithm for multi-objective job shop scheduling problems
    Kachitvichyanukul, Voratas
    Sitthitham, Siriwan
    [J]. JOURNAL OF INTELLIGENT MANUFACTURING, 2011, 22 (03) : 355 - 365
  • [2] A two-stage genetic algorithm for multi-objective job shop scheduling problems
    Voratas Kachitvichyanukul
    Siriwan Sitthitham
    [J]. Journal of Intelligent Manufacturing, 2011, 22 : 355 - 365
  • [3] The Improved Genetic Algorithm for Multi-objective Flexible Job Shop Scheduling Problem
    Yang, Jian Jun
    Ju, Lu Yan
    Liu, Bao Ye
    [J]. MECHANICAL, MATERIALS AND MANUFACTURING ENGINEERING, PTS 1-3, 2011, 66-68 : 870 - 875
  • [4] An Improved Genetic Algorithm for Multi-objective Flexible Job-shop Scheduling Problem
    Zhang, Chaoyong
    Wang, Xiaojuan
    Gao, Liang
    [J]. MANUFACTURING SCIENCE AND ENGINEERING, PTS 1-5, 2010, 97-101 : 2449 - 2454
  • [5] A multi-objective genetic algorithm for fuzzy flexible job-shop scheduling problem
    Wang, Xiaojuan
    Gao, Liang
    Zhang, Chaoyong
    Li, Xinyu
    [J]. INTERNATIONAL JOURNAL OF COMPUTER APPLICATIONS IN TECHNOLOGY, 2012, 45 (2-3) : 115 - 125
  • [6] Immune Genetic Algorithm for Multi-objective Flexible Job-shop Scheduling Problem
    Ren, Huizhi
    Xu, Han
    Sun, Shenshen
    [J]. PROCEEDINGS OF THE 28TH CHINESE CONTROL AND DECISION CONFERENCE (2016 CCDC), 2016, : 2167 - 2171
  • [7] A Memetic Algorithm for the Multi-Objective Flexible Job Shop Scheduling Problem
    Yuan, Yuan
    Xu, Hua
    [J]. GECCO'13: PROCEEDINGS OF THE 2013 GENETIC AND EVOLUTIONARY COMPUTATION CONFERENCE, 2013, : 559 - 566
  • [8] An Adaptive Multi-Objective Evolutionary Algorithm with Two-Stage Local Search for Flexible Job-Shop Scheduling
    Li, Yingli
    Wang, Jiahai
    Liu, Zhengwei
    [J]. INTERNATIONAL JOURNAL OF COMPUTATIONAL INTELLIGENCE SYSTEMS, 2021, 14 (01) : 54 - 66
  • [9] An improved multi-objective genetic algorithm for fuzzy flexible job-shop scheduling problem
    Wang, Xiaojuan
    Li, Wenfeng
    Zhang, Ying
    [J]. INTERNATIONAL JOURNAL OF COMPUTER APPLICATIONS IN TECHNOLOGY, 2013, 47 (2-3) : 280 - 288
  • [10] A Collaborative Evolutionary Algorithm for Multi-objective Flexible Job Shop Scheduling Problem
    Li, X. Y.
    Gao, L.
    [J]. 2011 IEEE INTERNATIONAL CONFERENCE ON SYSTEMS, MAN, AND CYBERNETICS (SMC), 2011, : 997 - 1002