Predicting construction delay risks in Saudi Arabian projects: A comparative analysis of CatBoost, XGBoost, and LGBM

被引:0
|
作者
Alsulamy, Saleh [1 ]
机构
[1] King Khalid Univ, Architecture & Planning Coll, Dept Architecture, Abha 61421, Saudi Arabia
关键词
Construction delay; Predictive analytics; Machine learning algorithms; CatBoost; XGBoost; LGBM; MODEL;
D O I
10.1016/j.eswa.2024.126268
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
Accurately forecasting construction delay risks is essential for effective project management in the construction industry. This study evaluates the performance of three machine learning algorithms CatBoost, XGBoost, and LGBM in predicting construction delays for Saudi Arabian projects with varying levels of Time Overrun (TO). Model efficiency is assessed using key performance metrics, including accuracy, misclassification error, precision, sensitivity, specificity, false positive rate (FPR), and false negative rate (FNR). The results demonstrate that LGBM outperforms CatBoost and XGBoost across all TO categories. For projects with less than 30% TO, LGBM achieves the highest accuracy and sensitivity. In the 30%-60% TO category, it continues to excel, particularly in accuracy and sensitivity. For projects exceeding 60% TO, LGBM maintains its lead with superior accuracy, sensitivity, and specificity. These findings establish LGBM as a highly effective algorithm for predicting construction delays, offering valuable insights for risk assessment and management in the construction sector. While CatBoost and XGBoost also deliver strong performance, showcasing their ability to predict delays across various TO levels, LGBM's consistent superiority highlights its robustness and reliability. This study advances the application of predictive analytics in construction delay risk management, paving the way for the development of effective risk mitigation strategies.
引用
收藏
页数:14
相关论文
共 50 条
  • [21] Schedule Delay Leading Indicators in Precast Concrete Construction Projects: Qualitative Comparative Analysis of Korean Cases
    Cho, Kyeongwoon
    Ahn, Seungjun
    Park, Kyungmo
    Kim, Tae Wan
    JOURNAL OF MANAGEMENT IN ENGINEERING, 2021, 37 (04)
  • [22] An Investigation into the Causes of Payment Delays and Deliberate Delay Tactics in Public Construction Projects in Saudi Arabia
    Bageis, Abdulrahman Salem
    BUILDINGS, 2024, 14 (06)
  • [23] Incorporating lost productivity calculation into delay analysis for construction projects
    Yang, Jyh-Bin
    Huang, Kuei-Mei
    Lee, Chang-Hung
    Chiu, Chui-Te
    KSCE JOURNAL OF CIVIL ENGINEERING, 2014, 18 (02) : 380 - 388
  • [24] Analysis of causes of delay in Indian construction projects and mitigation measures
    Prasad, K. V.
    Vasugi, V.
    Venkatesan, R.
    Bhat, Nikhil
    JOURNAL OF FINANCIAL MANAGEMENT OF PROPERTY AND CONSTRUCTION, 2019, 24 (01) : 58 - 78
  • [25] Incorporating lost productivity calculation into delay analysis for construction projects
    Jyh-Bin Yang
    Kuei-Mei Huang
    Chang-Hung Lee
    Chui-Te Chiu
    KSCE Journal of Civil Engineering, 2014, 18 : 380 - 388
  • [26] Delay Analysis Statements in the Presence of Debatable Concerns in Construction Projects
    Wasfy A.
    Nassar A.
    IEEE Engineering Management Review, 2021, 49 (04): : 123 - 135
  • [27] A Simulation-Based Scheduling Methodology for Construction Projects Considering the Potential Impacts of Delay Risks
    Camilo Paz, Juan
    Rozenboim, David
    Cuadros, Alvaro
    Cano, Sandra
    Willmer Escobar, John
    CONSTRUCTION ECONOMICS AND BUILDING, 2018, 18 (02): : 41 - 69
  • [28] COMMON CAUSES OF CONFLICTS IN CONSTRUCTION PROJECTS - COMPARATIVE ANALYSIS OF PROJECTS IN LIBYA AND SERBIA
    Elmabrok, Elmagdobi M.
    Nikola, Culic
    Dejan, Beljakovic
    Aleksandar, Milajic
    Goran, Pejicic
    ARCHIVES FOR TECHNICAL SCIENCES, 2016, (15): : 33 - 40
  • [29] Comparative Analysis of Project Risks across Construction Sectors
    Kim, Suryeon
    Ghimire, Prashnna
    Jeong, H. David
    Barutha, Philip
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2024, 150 (06)
  • [30] Analysis of risks factors associated with construction projects in urban wetlands ecosystem
    Asumadu, G.
    Quaigrain, R.
    Owusu-Manu, D.
    Edwards, D. J.
    Oduro-Ofori, E.
    Kukah, A. S. K.
    Nsafoah, S. K.
    INTERNATIONAL JOURNAL OF SUSTAINABLE DEVELOPMENT AND WORLD ECOLOGY, 2023, 30 (02): : 198 - 210