A Simulation-Based Scheduling Methodology for Construction Projects Considering the Potential Impacts of Delay Risks

被引:5
|
作者
Camilo Paz, Juan [1 ]
Rozenboim, David [2 ]
Cuadros, Alvaro [2 ]
Cano, Sandra [2 ]
Willmer Escobar, John [3 ]
机构
[1] Pontificia Univ Javeriana Cali, Dept Civil & Ind Engn, Cali, Colombia
[2] Univ Valle, Sch Ind Engn, Cali, Colombia
[3] Pontificia Univ Javeriana Cali, Cali, Colombia
来源
CONSTRUCTION ECONOMICS AND BUILDING | 2018年 / 18卷 / 02期
关键词
Construction; Monte Carlo simulation; project management; risk analysis; scheduling;
D O I
10.5130/AJCEB.v18i2.5842
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
This paper tackles the problem of scheduling construction projects considering the influence of delay risks. In the actual body of knowledge, several methods have been proposed to handle this problem, starting from the Project Evaluation and Review Technique to advanced simulation models. However, this investigation proposes a novel integration of one methodology with some approaches already existing in the literature related to Monte Carlo Simulation scheduling techniques as seen from the perspective of a practitioner. The research began with a literature review of both schedule risks and Monte Carlo based scheduling models for construction projects. Based on this, the methodology was designed with the constant participation of experts in the construction industry. As result of this, a comprehensive and practical methodology was constructed. Therefore, a new mathematical structure for the simulation model within the methodology was formulated in which a new concept for each risk defined as "potential impact"was used. Moreover, the simulation model is based on the judgment of experts and methods of the known literature such as the explicit model of the occurrence probability of the risks and the activity-risk factor matrix. Then, to validate the tool, the proposed methodology was applied using the information of an already constructed construction project of a public university of Colombia. The obtained results were a confidence-based forecast of the end date of the project and a quantitative importance measure of the modelled risks. These results were compared against the real history of the project since it was found an excellent performance of the proposed methodology. To sum up, the research process described above supports the validity of the proposed methodology.
引用
收藏
页码:41 / 69
页数:29
相关论文
共 50 条
  • [1] Schedule Delay Risk Analysis in Construction Projects with a Simulation-Based Expert System
    Koulinas, Georgios K.
    Xanthopoulos, Alexandros S.
    Tsilipiras, Thomas T.
    Koulouriotis, Dimitrios E.
    [J]. BUILDINGS, 2020, 10 (08)
  • [2] A simulation-based dynamic scheduling model for curtain wall production considering construction planning reliability
    Kim, Taehoon
    Kim, Yong-Woo
    Cho, Hunhee
    [J]. JOURNAL OF CLEANER PRODUCTION, 2021, 286
  • [3] Simulation-Based Multiagent Approach for Scheduling Modular Construction
    Taghaddos, Hosein
    Hermann, Ulrich
    AbouRizk, Simaan
    Mohamed, Yasser
    [J]. JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 2014, 28 (02) : 263 - 274
  • [4] TIME-STEPPED, SIMULATION-BASED SCHEDULING SYSTEM FOR LARGE-SCALE INDUSTRIAL CONSTRUCTION PROJECTS
    Hu, Di
    Mohamed, Yasser
    [J]. 2013 WINTER SIMULATION CONFERENCE (WSC), 2013, : 3249 - 3256
  • [5] Simulation-based crane operations planner for building construction projects
    Astour, Habeb
    Franz, Volkhard
    [J]. SIMULATION IN PRODUKTION UND LOGISTK 2013, 2013, 316 : 515 - 524
  • [6] Network-level scheduling of road construction projects considering user and business impacts
    Miralinaghi, Mohammad
    Woldemariam, Wubeshet
    Abraham, Dulcy M.
    Chen, Sikai
    Labi, Samuel
    Chen, Zhibin
    [J]. COMPUTER-AIDED CIVIL AND INFRASTRUCTURE ENGINEERING, 2020, 35 (07) : 650 - 667
  • [7] A scheduling methodology for dealing with uncertainty in construction projects
    Bruni, Maria Elena
    Beraldi, Patrizia
    Guerriero, Francesca
    Pinto, Erika
    [J]. ENGINEERING COMPUTATIONS, 2011, 28 (7-8) : 1064 - 1078
  • [8] A simulation-based method for effective workface planning of industrial construction projects
    Hu, Di
    Mohamed, Yasser
    Taghaddos, Hosein
    Hermann, Ulrich
    [J]. CONSTRUCTION MANAGEMENT AND ECONOMICS, 2018, 36 (06) : 328 - 347
  • [9] A simulation-based framework for concurrent safety and productivity improvement in construction projects
    Baniassadi, Farshid
    Alvanchi, Amin
    Mostafavi, Ali
    [J]. ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2018, 25 (11) : 1501 - 1515
  • [10] Simulation-Based Scheduling of Mutually Exclusive Projects with Precedence and Regional Budget Constraints
    Wang, Shiaaulir
    Schonfeld, Paul
    [J]. TRANSPORTATION RESEARCH RECORD, 2012, (2273) : 1 - 9