共 23 条
- [11] Groundwater drawdown induced ground settlement during tunneling - sensitivity analysis on influencing factors GEOTECHNICAL ASPECTS OF UNDERGROUND CONSTRUCTION IN SOFT GROUND, 2014, : 473 - 477
- [12] Risk analysis based on the parameters sensitivity analysis for ground settlement induced by shield tunneling Yanshilixue Yu Gongcheng Xuebao/Chinese Journal of Rock Mechanics and Engineering, 2015, 34 : 3604 - 3612
- [13] Seismic response and extended life analysis of the deepest top-down soil nail wall in the US GEO-SUPPORT 2004: DRILLED SHAFTS, MICROPILING, DEEP MIXING, REMEDIAL METHODS, AND SPECIALTY FOUNDATION SYSTEMS, 2004, (124): : 723 - 740
- [16] Analysis of control standard for ground surface settlement in excavating metro station by shield tunnel combined with pile-beam-arch method Yantu Lixue/Rock and Soil Mechanics, 2012, 33 (SUPPL. 2): : 289 - 296
- [18] SENSITIVITY ANALYSIS OF GROUND SOURCE HEAT PUMP PERFORMANCE ON SELECTED SOIL AND OPERATING PARAMETERS ENERGY AND CLEAN TECHNOLOGIES, 2015, : 511 - 518
- [19] Analysis on the Response of Ground Surface Settlement for a Metro Station during Construction Using the Pile-Beam-Arch (PBA) Method Subjected to Pore Pressure GEO-CHINA 2016: EMERGING TECHNOLOGIES IN TUNNEL ENGINEERING, MODELING, DESIGN, CONSTRUCTION, REPAIR, AND REHABILITATION, 2016, (260): : 243 - 250