共 24 条
- [5] Research on Surface Settlement of Subway Station Construction Using Pile-Beam-Arch Approach [J]. 6TH INTERNATIONAL CONFERENCE ON ENVIRONMENTAL SCIENCE AND CIVIL ENGINEERING, 2020, 455
- [6] Numerical Analysis of Metro Station Construction by Large-Diameter Shield and Pile-Beam-Arch Method [J]. ADVANCES IN CIVIL ENGINEERING AND ARCHITECTURE INNOVATION, PTS 1-6, 2012, 368-373 : 2711 - +
- [7] ANALYSIS OF THE INFLUENCE OF SIDE WALL OPENING ON THE ARCH STRUCTURE OF METRO STATION USING THE PILE-BEAM-ARCH METHOD [J]. CIVIL ENGINEERING JOURNAL-STAVEBNI OBZOR, 2023, 33 (03): : 397 - 408
- [8] The Surface Settlement Law of Precipitation in Pile-Beam-Arch Station Adjacent to Pile Foundation [J]. KSCE Journal of Civil Engineering, 2023, 27 : 1441 - 1457
- [10] Numerical analysis on the mechanical performance of supporting structures and ground settlement characteristics in construction process of subway station built by Pile-Beam-Arch method [J]. KSCE Journal of Civil Engineering, 2017, 21 : 1690 - 1705