Analysis on the Response of Ground Surface Settlement for a Metro Station during Construction Using the Pile-Beam-Arch (PBA) Method Subjected to Pore Pressure

被引:0
|
作者
Xu, Fei [1 ]
Li, Li-Ping [1 ]
Zhang, Qian-Qing [1 ]
Wang, Zhe-Chao [1 ]
He, Peng [1 ]
机构
[1] Shandong Univ, Res Ctr Geotech & Struct Engn, Jinan, Peoples R China
基金
中国国家自然科学基金;
关键词
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
A simple approach to predict the settlement of ground surface during the construction of metro tunneling using pile-beam-arch (PBA) method, subjected to pore pressure is presented. As to the analysis on the response of a single pile installed beneath the tunnel, a softening nonlinear model was adopted to predict the relationship between unit skin friction and pile-soil relative displacement developed along the pile-soil interface and a bilinear base load-displacement model was used to predict the relationship developed at the pile end. To analyze the settlement of ground surface during the construction of metro tunneling using PBA method, a highly effective iterative computer program was developed. In order to demonstrate the effectiveness and accuracy of the proposed simple method in this paper, the result is compared with one well-instrumented previous test. The proposed simple analytical approach is economical and efficient, and suitable for the analysis of the settlement of ground surface during the construction of metro tunneling using pile-beam-arch (PBA) method subjected to pore pressure.
引用
收藏
页码:243 / 250
页数:8
相关论文
共 24 条
  • [1] Ground surface settlement response to subway station construction activities using pile-beam-arch method
    Guo, Xiangyu
    Wang, Zhengzheng
    Geng, Ping
    Chen, Changjian
    Zhang, Jing
    [J]. TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2021, 108
  • [2] Surface settlement of subway station construction using pile-beam-arch approach
    Yu, Lin
    Zhang, Dingli
    Fang, Qian
    Cao, Liqiang
    Xu, Tong
    Li, Qianqian
    [J]. TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2019, 90 : 340 - 356
  • [3] Numerical study study on the response of ground movements to construction activities of a metro station using the pile-beam-arch method
    Li, B.
    Wang, Z. Z.
    [J]. TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2019, 88 : 209 - 220
  • [4] Analysis of control standard for ground surface settlement in excavating metro station by shield tunnel combined with pile-beam-arch method
    Wang Fang
    He Shao-hui
    Liu Jun
    Cao Rui-lang
    [J]. ROCK AND SOIL MECHANICS, 2012, 33 : 289 - 296
  • [5] Research on Surface Settlement of Subway Station Construction Using Pile-Beam-Arch Approach
    Xu, Yushan
    Tang, Bo
    Duan, Yanwei
    [J]. 6TH INTERNATIONAL CONFERENCE ON ENVIRONMENTAL SCIENCE AND CIVIL ENGINEERING, 2020, 455
  • [6] Numerical Analysis of Metro Station Construction by Large-Diameter Shield and Pile-Beam-Arch Method
    Ding, Deyun
    Yang, Xiuren
    Lu, Weidong
    Liu, Weining
    Yan, Mei
    Li, Aimin
    [J]. ADVANCES IN CIVIL ENGINEERING AND ARCHITECTURE INNOVATION, PTS 1-6, 2012, 368-373 : 2711 - +
  • [7] ANALYSIS OF THE INFLUENCE OF SIDE WALL OPENING ON THE ARCH STRUCTURE OF METRO STATION USING THE PILE-BEAM-ARCH METHOD
    Dai, Yongxing
    Pei, Xingkai
    Chen, Zekun
    Shi, Bolun
    Zhang, Huijian
    Yang, Yujie
    Chen, Wei
    [J]. CIVIL ENGINEERING JOURNAL-STAVEBNI OBZOR, 2023, 33 (03): : 397 - 408
  • [8] The Surface Settlement Law of Precipitation in Pile-Beam-Arch Station Adjacent to Pile Foundation
    Yunsi Liu
    Yueyuan Huang
    [J]. KSCE Journal of Civil Engineering, 2023, 27 : 1441 - 1457
  • [9] The Surface Settlement Law of Precipitation in Pile-Beam-Arch Station Adjacent to Pile Foundation
    Liu, Yunsi
    Huang, Yueyuan
    [J]. KSCE JOURNAL OF CIVIL ENGINEERING, 2023, 27 (04) : 1441 - 1457
  • [10] Numerical analysis on the mechanical performance of supporting structures and ground settlement characteristics in construction process of subway station built by Pile-Beam-Arch method
    Xinrong Liu
    Yongquan Liu
    Zhongping Yang
    Chunmei He
    [J]. KSCE Journal of Civil Engineering, 2017, 21 : 1690 - 1705