Numerical study study on the response of ground movements to construction activities of a metro station using the pile-beam-arch method

被引:29
|
作者
Li, B. [1 ,3 ]
Wang, Z. Z. [2 ]
机构
[1] Wuhan Univ Technol, Sch Transportat, Wuhan, Hubei, Peoples R China
[2] Dalian Univ Technol, Sch Civil Engn, Dalian, Peoples R China
[3] Hubei Highway Engn Res Ctr, Wuhan, Hubei, Peoples R China
基金
中国国家自然科学基金;
关键词
Metro station; The pile-beam-arch method; Pilot tunnels; Ground surface settlement; Settlement control measures; SUBWAY STATION; EXCAVATION; SETTLEMENT;
D O I
10.1016/j.tust.2019.03.014
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
This paper aims to investigate the issues associated with the pile-beam-arch method for construction of metro stations. First, a detailed description of the procedures involved in the construction of a metro station is given. Secondly, a three-dimensional numerical model is established by FLAC(3D) to simulate the main construction process in practice, which consists of three phases, the excavation of the pilot tunnels, the installation of the load-bearing system, and the removal of the soil inside the metro station. These phases are then divided into fifteen construction steps, at the end of which the resulting ground surface settlements are recorded and analyzed. Numerical results reveal that the resulting displacements can be divided into four categories, the tunneling-induced settlement, the settlement occurs in response to an increase in vertical pressure, the tunneling-induced settlement in the presence of the load-bearing system, and the settlement occurs in response to a decrease in vertical pressure. Thirdly, the effects of settlement control measures are evaluated and discussed. Lastly, the comparison between the simulated and observed ground surface settlements collected from the existing literature are used to illustrate the effects of dewatering and the construction of working shafts and connecting tunnels.
引用
收藏
页码:209 / 220
页数:12
相关论文
共 50 条
  • [1] Ground surface settlement response to subway station construction activities using pile-beam-arch method
    Guo, Xiangyu
    Wang, Zhengzheng
    Geng, Ping
    Chen, Changjian
    Zhang, Jing
    [J]. TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2021, 108
  • [2] Numerical Analysis of Metro Station Construction by Large-Diameter Shield and Pile-Beam-Arch Method
    Ding, Deyun
    Yang, Xiuren
    Lu, Weidong
    Liu, Weining
    Yan, Mei
    Li, Aimin
    [J]. ADVANCES IN CIVIL ENGINEERING AND ARCHITECTURE INNOVATION, PTS 1-6, 2012, 368-373 : 2711 - +
  • [3] Analysis on the Response of Ground Surface Settlement for a Metro Station during Construction Using the Pile-Beam-Arch (PBA) Method Subjected to Pore Pressure
    Xu, Fei
    Li, Li-Ping
    Zhang, Qian-Qing
    Wang, Zhe-Chao
    He, Peng
    [J]. GEO-CHINA 2016: EMERGING TECHNOLOGIES IN TUNNEL ENGINEERING, MODELING, DESIGN, CONSTRUCTION, REPAIR, AND REHABILITATION, 2016, (260): : 243 - 250
  • [4] Study on the Proportion of Stratum Deformation in the Excavation Stage of Metro Station with the Pile-Beam-Arch Method
    Dai, Yongxing
    Pei, Xingkai
    Guo, Guangyao
    Zhang, Huijian
    Chen, Zekun
    [J]. INDIAN GEOTECHNICAL JOURNAL, 2024, 54 (02) : 407 - 420
  • [5] ANALYSIS OF THE INFLUENCE OF SIDE WALL OPENING ON THE ARCH STRUCTURE OF METRO STATION USING THE PILE-BEAM-ARCH METHOD
    Dai, Yongxing
    Pei, Xingkai
    Chen, Zekun
    Shi, Bolun
    Zhang, Huijian
    Yang, Yujie
    Chen, Wei
    [J]. CIVIL ENGINEERING JOURNAL-STAVEBNI OBZOR, 2023, 33 (03): : 397 - 408
  • [6] Study on the Applicability of an Improved Pile-Beam-Arch Method of Metro Station Construction in the Upper-Soft and Lower-Hard Stratum
    Guo, Xinping
    Jiang, Annan
    Wang, Shanyong
    [J]. ADVANCES IN CIVIL ENGINEERING, 2021, 2021
  • [7] Prediction of existing pipeline settlement resulting from the construction of an underground metro station using the pile-beam-arch (PBA) method
    Wang, Xiuying
    Lei, Ke
    Wang, Teng
    Zhang, Jianguo
    [J]. Tumu Gongcheng Xuebao/China Civil Engineering Journal, 2021, 54 : 65 - 75
  • [8] Surface settlement of subway station construction using pile-beam-arch approach
    Yu, Lin
    Zhang, Dingli
    Fang, Qian
    Cao, Liqiang
    Xu, Tong
    Li, Qianqian
    [J]. TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2019, 90 : 340 - 356
  • [9] Enlarging a large-diameter shield tunnel using the Pile-Beam-Arch method to create a metro station
    Liu, Jun
    Wang, Fang
    He, Shaohui
    Wang, Enzhi
    Zhou, Hong
    [J]. TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2015, 49 : 130 - 143
  • [10] Analysis of stratum deformation and pile foundation response during subway station built by pile-beam-arch construction method
    School of Civil Engineering and Architecture, Beijing Jiaotong University, Beijing 100044, China
    不详
    [J]. Beijing Jiaotong Daxue Xuebao, 2008, 3 (30-36): : 30 - 36