Prediction of existing pipeline settlement resulting from the construction of an underground metro station using the pile-beam-arch (PBA) method

被引:0
|
作者
Wang, Xiuying [1 ]
Lei, Ke [1 ]
Wang, Teng [1 ]
Zhang, Jianguo [1 ]
机构
[1] Key Laboratory of Urban Underground Engineering of Ministry of Education, Beijing Jiaotong University, Beijing,100044, China
关键词
Pipelines;
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
页码:65 / 75
相关论文
共 37 条
  • [1] Analysis on the Response of Ground Surface Settlement for a Metro Station during Construction Using the Pile-Beam-Arch (PBA) Method Subjected to Pore Pressure
    Xu, Fei
    Li, Li-Ping
    Zhang, Qian-Qing
    Wang, Zhe-Chao
    He, Peng
    GEO-CHINA 2016: EMERGING TECHNOLOGIES IN TUNNEL ENGINEERING, MODELING, DESIGN, CONSTRUCTION, REPAIR, AND REHABILITATION, 2016, (260): : 243 - 250
  • [2] Surface settlement of subway station construction using pile-beam-arch approach
    Yu, Lin
    Zhang, Dingli
    Fang, Qian
    Cao, Liqiang
    Xu, Tong
    Li, Qianqian
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2019, 90 : 340 - 356
  • [3] Ground surface settlement response to subway station construction activities using pile-beam-arch method
    Guo, Xiangyu
    Wang, Zhengzheng
    Geng, Ping
    Chen, Changjian
    Zhang, Jing
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2021, 108
  • [4] Research on Surface Settlement of Subway Station Construction Using Pile-Beam-Arch Approach
    Xu, Yushan
    Tang, Bo
    Duan, Yanwei
    6TH INTERNATIONAL CONFERENCE ON ENVIRONMENTAL SCIENCE AND CIVIL ENGINEERING, 2020, 455
  • [5] Numerical Analysis of Metro Station Construction by Large-Diameter Shield and Pile-Beam-Arch Method
    Ding, Deyun
    Yang, Xiuren
    Lu, Weidong
    Liu, Weining
    Yan, Mei
    Li, Aimin
    ADVANCES IN CIVIL ENGINEERING AND ARCHITECTURE INNOVATION, PTS 1-6, 2012, 368-373 : 2711 - +
  • [6] Numerical study study on the response of ground movements to construction activities of a metro station using the pile-beam-arch method
    Li, B.
    Wang, Z. Z.
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2019, 88 : 209 - 220
  • [7] ANALYSIS OF THE INFLUENCE OF SIDE WALL OPENING ON THE ARCH STRUCTURE OF METRO STATION USING THE PILE-BEAM-ARCH METHOD
    Dai, Yongxing
    Pei, Xingkai
    Chen, Zekun
    Shi, Bolun
    Zhang, Huijian
    Yang, Yujie
    Chen, Wei
    CIVIL ENGINEERING JOURNAL-STAVEBNI OBZOR, 2023, 33 (03): : 397 - 408
  • [8] Analysis of control standard for ground surface settlement in excavating metro station by shield tunnel combined with pile-beam-arch method
    Wang, Fang
    He, Shao-Hui
    Liu, Jun
    Cao, Rui-Lang
    Yantu Lixue/Rock and Soil Mechanics, 2012, 33 (SUPPL. 2): : 289 - 296
  • [9] Analysis of control standard for ground surface settlement in excavating metro station by shield tunnel combined with pile-beam-arch method
    Wang Fang
    He Shao-hui
    Liu Jun
    Cao Rui-lang
    ROCK AND SOIL MECHANICS, 2012, 33 : 289 - 296
  • [10] The Surface Settlement Law of Precipitation in Pile-Beam-Arch Station Adjacent to Pile Foundation
    Yunsi Liu
    Yueyuan Huang
    KSCE Journal of Civil Engineering, 2023, 27 : 1441 - 1457