A BIM-based carbon footprinting of earthworks in road construction process

被引:0
|
作者
Lou, Baowen [1 ]
Rasmussen, Freja Nygaard [1 ]
Degago, Samson Abate [1 ,2 ]
Juvik, Eivind Schnell [2 ]
Bohne, Rolf Andre [1 ]
机构
[1] Norwegian Univ Sci & Technol, Dept Civil & Environm Engn, Hogskoleringen 7A, N-7491 Trondheim, Trondelag, Norway
[2] Norwegian Publ Rd Adm, Sorgenfriveien 11, N-7031 Trondheim, Trondelag, Norway
关键词
Earthworks; Building Information Modelling; Carbon dioxide emission; Sustainability; Road construction; GREENHOUSE-GAS EMISSIONS; OPTIMIZATION SYSTEM; ON-SITE; SUSTAINABILITY; EQUIPMENT; DESIGN; MODEL;
D O I
10.1016/j.eiar.2024.107731
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Carbon dioxide emissions are a major component of greenhouse gases and their evaluation during the life cycle of civil infrastructures is increasingly becoming a pivotal criterion for project tendering. During construction activities, the use of heavy-duty vehicles generally accounts for most of the energy consumption. However, the CO2 emissions deriving from earthwork machines have not been thoroughly calculated yet due to the inner complexity of such task. In this regard, this research streamlines a quantitative assessment process of carbon dioxide leveraging digital tools and considering a bicycle lane project stretching approximately 3 km in Trondheim, Norway. Building Information Modelling (BIM) is adopted to define the necessary earthwork operations and provide accurate data to appraise quantity take-off volumes. Three earthwork tasks, namely excavation, transport and compaction, are investigated. The corresponding CO2 emissions are subsequently quantified considering three operating modes for excavator (idling, moving and working), three types of transport vehicles (wheel dozer, tractor scraper and articulated dump truck) and two models of compaction machines (sheepsfoot and vibratory rollers). The results indicate that 75.5 t CO2 emissions are generated from the on-site heavy machines. In particular, the transport activities contribute to the largest proportion of CO2 emissions (56 %), half of which is produced while moving excess soil to the dump pit. Besides, the amount of carbon dioxide (2.9 t) generated during the idling and moving statuses of excavator is not negligible. Therefore, an optimized construction workflow and proper planning process are required to reduce machine fuel consumptions as well as increase the working efficiency. Bearing in mind the strategic importance represented by early planning for sustainable construction activities, this study provides innovative insights regarding the assessment of carbon footprints generated by earthwork machines.
引用
收藏
页数:10
相关论文
共 50 条
  • [41] Collaboration barriers in BIM-based construction networks: A conceptual model
    Oraee, Mehran
    Hosseini, M. Reza
    Edwards, David J.
    Li, Heng
    Papadonikolaki, Eleni
    Cao, Dongping
    INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2019, 37 (06) : 839 - 854
  • [42] BIM-Based Visualization Research in the Construction Industry: A Network Analysis
    Wu, Zezhou
    Chen, Changhong
    Cai, Yuzhu
    Lu, Chen
    Wang, Hao
    Yu, Tao
    INTERNATIONAL JOURNAL OF ENVIRONMENTAL RESEARCH AND PUBLIC HEALTH, 2019, 16 (18)
  • [43] BIM-Based Pavement Management Tool for Scheduling Urban Road Maintenance
    Oreto, Cristina
    Massotti, Luigi
    Biancardo, Salvatore Antonio
    Veropalumbo, Rosa
    Viscione, Nunzio
    Russo, Francesca
    INFRASTRUCTURES, 2021, 6 (11)
  • [44] Dynamo script and a BIM-based process for measuring embodied carbon in buildings during the design phase
    Alzara, Majed
    Yosri, Ahmed M.
    Alruwaili, Amer
    Cuce, Erdem
    Eldin, Sayed M.
    Ehab, A.
    INTERNATIONAL JOURNAL OF LOW-CARBON TECHNOLOGIES, 2023, 18 : 943 - 955
  • [45] Promotion of the Application of BIM in China-A BIM-Based Model for Construction Material Recycling
    Zhang, Kefei
    Jia, Jing
    RECYCLING, 2021, 6 (01) : 1 - 11
  • [46] Collaborative BIM-Based Construction Coordination Progress Modeling Using Extended Collaborative Process Modeling (exCPM)
    Shim, Jae-Hyung
    Ham, Nam-Hyuk
    Kim, Jae-Jun
    BUILDINGS, 2024, 14 (02)
  • [47] Applying Analytical Hierarchy Process (AHP) to BIM-Based Risk Management for Optimal Performance in Construction Projects
    Aladayleh, Khaled Jameel
    Aladaileh, Mohammad J.
    BUILDINGS, 2024, 14 (11)
  • [48] BIM-based model checking in a business process management environment
    Gade, P. N.
    Hansen, R.
    Svidt, K.
    EWORK AND EBUSINESS IN ARCHITECTURE, ENGINEERING AND CONSTRUCTION, 2018, : 305 - 312
  • [49] BIM-based process management model for building design and refurbishment
    Ustinovichius, Leonas
    Popov, Vladimir
    Cepurnaite, Jovita
    Vilutiene, Tatjana
    Samofalov, Michail
    Miedzialowski, Czeslaw
    ARCHIVES OF CIVIL AND MECHANICAL ENGINEERING, 2018, 18 (04) : 1136 - 1149
  • [50] The BIM-Based Building Permit Process: Factors Affecting Adoption
    Ullah, Kaleem
    Witt, Emlyn
    Lill, Irene
    BUILDINGS, 2022, 12 (01)