A BIM-based carbon footprinting of earthworks in road construction process

被引:0
|
作者
Lou, Baowen [1 ]
Rasmussen, Freja Nygaard [1 ]
Degago, Samson Abate [1 ,2 ]
Juvik, Eivind Schnell [2 ]
Bohne, Rolf Andre [1 ]
机构
[1] Norwegian Univ Sci & Technol, Dept Civil & Environm Engn, Hogskoleringen 7A, N-7491 Trondheim, Trondelag, Norway
[2] Norwegian Publ Rd Adm, Sorgenfriveien 11, N-7031 Trondheim, Trondelag, Norway
关键词
Earthworks; Building Information Modelling; Carbon dioxide emission; Sustainability; Road construction; GREENHOUSE-GAS EMISSIONS; OPTIMIZATION SYSTEM; ON-SITE; SUSTAINABILITY; EQUIPMENT; DESIGN; MODEL;
D O I
10.1016/j.eiar.2024.107731
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Carbon dioxide emissions are a major component of greenhouse gases and their evaluation during the life cycle of civil infrastructures is increasingly becoming a pivotal criterion for project tendering. During construction activities, the use of heavy-duty vehicles generally accounts for most of the energy consumption. However, the CO2 emissions deriving from earthwork machines have not been thoroughly calculated yet due to the inner complexity of such task. In this regard, this research streamlines a quantitative assessment process of carbon dioxide leveraging digital tools and considering a bicycle lane project stretching approximately 3 km in Trondheim, Norway. Building Information Modelling (BIM) is adopted to define the necessary earthwork operations and provide accurate data to appraise quantity take-off volumes. Three earthwork tasks, namely excavation, transport and compaction, are investigated. The corresponding CO2 emissions are subsequently quantified considering three operating modes for excavator (idling, moving and working), three types of transport vehicles (wheel dozer, tractor scraper and articulated dump truck) and two models of compaction machines (sheepsfoot and vibratory rollers). The results indicate that 75.5 t CO2 emissions are generated from the on-site heavy machines. In particular, the transport activities contribute to the largest proportion of CO2 emissions (56 %), half of which is produced while moving excess soil to the dump pit. Besides, the amount of carbon dioxide (2.9 t) generated during the idling and moving statuses of excavator is not negligible. Therefore, an optimized construction workflow and proper planning process are required to reduce machine fuel consumptions as well as increase the working efficiency. Bearing in mind the strategic importance represented by early planning for sustainable construction activities, this study provides innovative insights regarding the assessment of carbon footprints generated by earthwork machines.
引用
收藏
页数:10
相关论文
共 50 条
  • [21] A BIM-Based Code Checking Approach for Green Construction
    Jiang, Shaohua
    Wu, Zheng
    ICCREM 2017: INDUSTRY REGULATION AND SUSTAINABLE DEVELOPMENT, 2017, : 156 - 163
  • [22] BIM-based Mixed Reality Application for Supervision of Construction
    Raimbaud, Pierre
    Lou, Ruding
    Merienne, Frederic
    Danglade, Florence
    Figueroa, Pablo
    Tiberio Hernandez, Jose
    2019 26TH IEEE CONFERENCE ON VIRTUAL REALITY AND 3D USER INTERFACES (VR), 2019, : 1903 - 1907
  • [23] BIM-BASED RISK IDENTIFICATION SYSTEM IN TUNNEL CONSTRUCTION
    Zhang, Limao
    Wu, Xianguo
    Ding, Lieyun
    Skibniewski, Miroslaw J.
    Lu, Yujie
    JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2016, 22 (04) : 529 - 539
  • [24] Application of PKPM BIM-based Construction Management Platform
    LI Zhi
    WANG Jing
    SHU Zhiqiang
    Computer Aided Drafting,Design and Manufacturing, 2014, (01) : 74 - 82
  • [25] BIM-based traffic analysis and simulation at road intersection design
    Castaneda, Karen
    Sanchez, Omar
    Herrera, Rodrigo F.
    Pellicer, Eugenio
    Porras, Hernan
    AUTOMATION IN CONSTRUCTION, 2021, 131
  • [26] BIM-based Fine Cost Management of the Whole Process
    Zhang, JiaYuan
    2019 3RD INTERNATIONAL WORKSHOP ON RENEWABLE ENERGY AND DEVELOPMENT (IWRED 2019), 2019, 267
  • [27] BIM-Based Integrated Design Approach for Low Carbon Green Building Optimization and Sustainable Construction
    Gan, Vincent J. L.
    Lo, Irene M. C.
    Tse, K. T.
    Wong, C. L.
    Cheng, Jack C. P.
    Chan, C. M.
    COMPUTING IN CIVIL ENGINEERING 2019: VISUALIZATION, INFORMATION MODELING, AND SIMULATION, 2019, : 417 - 424
  • [28] A novel BIM-based process workflow for building retrofit
    D'Angelo, Letizia
    Hajdukiewicz, Magdalena
    Seri, Federico
    Keane, Marcus M.
    JOURNAL OF BUILDING ENGINEERING, 2022, 50
  • [29] A BIM-based construction quality management model and its applications
    Chen, LiJuan
    Luo, Hanbin
    AUTOMATION IN CONSTRUCTION, 2014, 46 : 64 - 73
  • [30] Contractual challenges for BIM-based construction projects: a systematic review
    Abd Jamil, Ahmad Huzaimi
    Fathi, Mohamad Syazli
    BUILT ENVIRONMENT PROJECT AND ASSET MANAGEMENT, 2018, 8 (04) : 372 - 385