A BIM-based carbon footprinting of earthworks in road construction process

被引:0
|
作者
Lou, Baowen [1 ]
Rasmussen, Freja Nygaard [1 ]
Degago, Samson Abate [1 ,2 ]
Juvik, Eivind Schnell [2 ]
Bohne, Rolf Andre [1 ]
机构
[1] Norwegian Univ Sci & Technol, Dept Civil & Environm Engn, Hogskoleringen 7A, N-7491 Trondheim, Trondelag, Norway
[2] Norwegian Publ Rd Adm, Sorgenfriveien 11, N-7031 Trondheim, Trondelag, Norway
关键词
Earthworks; Building Information Modelling; Carbon dioxide emission; Sustainability; Road construction; GREENHOUSE-GAS EMISSIONS; OPTIMIZATION SYSTEM; ON-SITE; SUSTAINABILITY; EQUIPMENT; DESIGN; MODEL;
D O I
10.1016/j.eiar.2024.107731
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Carbon dioxide emissions are a major component of greenhouse gases and their evaluation during the life cycle of civil infrastructures is increasingly becoming a pivotal criterion for project tendering. During construction activities, the use of heavy-duty vehicles generally accounts for most of the energy consumption. However, the CO2 emissions deriving from earthwork machines have not been thoroughly calculated yet due to the inner complexity of such task. In this regard, this research streamlines a quantitative assessment process of carbon dioxide leveraging digital tools and considering a bicycle lane project stretching approximately 3 km in Trondheim, Norway. Building Information Modelling (BIM) is adopted to define the necessary earthwork operations and provide accurate data to appraise quantity take-off volumes. Three earthwork tasks, namely excavation, transport and compaction, are investigated. The corresponding CO2 emissions are subsequently quantified considering three operating modes for excavator (idling, moving and working), three types of transport vehicles (wheel dozer, tractor scraper and articulated dump truck) and two models of compaction machines (sheepsfoot and vibratory rollers). The results indicate that 75.5 t CO2 emissions are generated from the on-site heavy machines. In particular, the transport activities contribute to the largest proportion of CO2 emissions (56 %), half of which is produced while moving excess soil to the dump pit. Besides, the amount of carbon dioxide (2.9 t) generated during the idling and moving statuses of excavator is not negligible. Therefore, an optimized construction workflow and proper planning process are required to reduce machine fuel consumptions as well as increase the working efficiency. Bearing in mind the strategic importance represented by early planning for sustainable construction activities, this study provides innovative insights regarding the assessment of carbon footprints generated by earthwork machines.
引用
收藏
页数:10
相关论文
共 50 条
  • [31] Scientometric analysis of BIM-based research in construction engineering and management
    Jin, Ruoyu
    Zou, Yang
    Gidado, Kassim
    Ashton, Phillip
    Painting, Noel
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2019, 26 (08) : 1750 - 1776
  • [32] An integrated BIM-based approach for cost estimation in construction projects
    Fazeli, Abdulwahed
    Dashti, Mohammad Saleh
    Jalaei, Farzad
    Khanzadi, Mostafa
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2021, 28 (09) : 2828 - 2854
  • [33] Research on BIM-based construction domain text information management
    Jiang, Shaohua
    Zhang, Haiyan
    Dalian, Jian Zhang
    Journal of Networks, 2013, 8 (06) : 1455 - 1464
  • [34] BIM-Based Automated Drainage System Design in Prefabrication Construction
    Zhang, Nan
    Tian, Yichen
    Wang, Jingwen
    Al-Hussein, Mohamed
    CONSTRUCTION RESEARCH CONGRESS 2020: COMPUTER APPLICATIONS, 2020, : 1146 - 1155
  • [35] Development and application of BIM-based highway construction management platform
    Fu, Q.
    Zhang, L. W.
    Xie, M. W.
    He, X. D.
    ROCK MECHANICS: ACHIEVEMENTS AND AMBITIONS, 2012, : 875 - 878
  • [36] BIM-based Collaborative Schedule Management System for the Construction Industry
    Hou, Xue-liang
    Lin, Zhi-ming
    2016 INTERNATIONAL CONFERENCE ON MANAGEMENT, ECONOMICS AND SOCIAL DEVELOPMENT (ICMESD 2016), 2016, : 957 - 962
  • [37] DIGITALIZATION AND PROCUREMENT IN CONSTRUCTION PROJECTS: AN INTEGRATED BIM-BASED APPROACH
    Matos, Bruno C.
    Cruz, Carlos O.
    Branco, Fernando B.
    JOURNAL OF INFORMATION TECHNOLOGY IN CONSTRUCTION, 2024, 29 : 400 - 423
  • [38] Advantages and Implementation Steps of BIM-based Construction Project Management
    Li, Xiang
    Cao, Lei
    PROCEEDINGS OF THE 2016 4TH INTERNATIONAL CONFERENCE ON ELECTRICAL & ELECTRONICS ENGINEERING AND COMPUTER SCIENCE (ICEEECS 2016), 2016, 50 : 441 - 444
  • [39] Research on BIM-based Construction Project Organization Interface Management
    Liu, Honglei
    Wang, Guangbin
    Zhang, Lei
    ARCHITECTURE, BUILDING MATERIALS AND ENGINEERING MANAGEMENT, PTS 1-4, 2013, 357-360 : 2781 - 2784
  • [40] BIM-based construction technology life-cycle management
    Zhang, L. D.
    Wang, G. J.
    2015 3RD INTERNATIONAL CONFERENCE ON SOFT COMPUTING IN INFORMATION COMMUNICATION TECHNOLOGY (SCICT 2015), 2015, : 3 - 5