Methods and procedures for tool monitoring in flexible manufacturing

被引:0
|
作者
Buchholz, Thomas [1 ]
Kuhn, Roman [1 ]
机构
[1] Niedecker GmbH, Germany
来源
VDI-Z | 1988年 / 130卷 / 12期
关键词
D O I
暂无
中图分类号
学科分类号
摘要
10
引用
收藏
页码:72 / 76
相关论文
共 50 条
  • [21] OPTIMAL PERIODICITY IN WORKPIECE MONITORING IN FLEXIBLE MANUFACTURING
    ZDANOVICH, IA
    LOBUNINA, II
    YAKUSHENKO, EA
    [J]. MEASUREMENT TECHNIQUES USSR, 1985, 28 (06): : 484 - 487
  • [22] Monitoring the desynchronizing dysfunctions in flexible manufacturing systems
    Culita, J
    Caramihai, SI
    Stanescu, A
    [J]. LARGE SCALE SYSTEMS: THEORY AND APPLICATIONS 2001 (LSS'01), 2001, : 505 - 510
  • [23] Tool requirements planning in a flexible manufacturing system with an automatic tool transporter
    Kim, YD
    Lee, GC
    Choi, SK
    Lim, SK
    [J]. IEEE TRANSACTIONS ON ROBOTICS AND AUTOMATION, 2001, 17 (06): : 795 - 804
  • [24] LEARNING PROCEDURES IN MACHINE-TOOL MONITORING
    MONOSTORI, L
    [J]. COMPUTERS IN INDUSTRY, 1986, 7 (01) : 53 - 64
  • [25] Due-date based loading and scheduling methods for a flexible manufacturing system with an automatic tool transporter
    Roh, HK
    Kim, YD
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1997, 35 (11) : 2989 - 3003
  • [26] Toward an implementation of recovery procedures for flexible manufacturing systems supervision
    Berruet, P
    Toguyeni, AKA
    Elkhattabi, S
    Craye, E
    [J]. COMPUTERS IN INDUSTRY, 2000, 43 (03) : 227 - 236
  • [27] FLEXIBLE MANUFACTURING SYSTEMS - METHODS AND STUDIES - KUSIAK,A
    VANBEEK, P
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1987, 28 (01) : 113 - 113
  • [28] Integrated scheduling and tool management in flexible manufacturing systems
    Akturk, MS
    Ozkan, S
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2001, 39 (12) : 2697 - 2722
  • [29] Solving tool allocation problem in flexible manufacturing system
    Natl. Inst. of Indust. Engineering, Mumbai 400 087, India
    不详
    [J]. J Inst Eng India Part PR, 1 (16-20):
  • [30] Sequencing and scheduling of job and tool in a flexible manufacturing cell
    Prabaharan, T.
    Nakkeeran, P. R.
    Jawahar, N.
    [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2006, 29 (7-8): : 729 - 745