Due-date based loading and scheduling methods for a flexible manufacturing system with an automatic tool transporter

被引:47
|
作者
Roh, HK
Kim, YD
机构
[1] KOREA ADV INST SCI & TECHNOL, DEPT IND ENGN, YUSONG GU, TAEJON 305701, SOUTH KOREA
[2] SAMSUNG SDS, SOFTWARE DEV TEAM, GWANAK GU, SEOUL 151742, SOUTH KOREA
关键词
D O I
10.1080/002075497194255
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
We consider the loading and scheduling problems in flexible :manufacturing systems (FMSs) in which each part visits only one machine for its entire processing In this type of FMS, if required tools are not loaded on the tool magazine of a machine, they can be transferred from other machines or a tool crib. For the efficient operation of such systems, loading and scheduling of parts and tools should be done carefully. This paper focuses on the problems of part loading, tool loading, and part sequencing with the objective of minimizing the total tardiness. We suggest three heuristic approaches, called list scheduling, sequential, and iterative approaches. In the list scheduling approach, loading plans of parts and tools and schedules are determined simultaneously according to part priorities. In the sequential approach, a parallel machine scheduling problem is solved to determine the loading plan and the sequence of parts, and then the tool loading problem is solved using the part loading plan. With methods similar to those used in the sequential approach, the part loading and sequencing problem and tool loading problem are solved iteratively in the iterative approach. Results of computational tests on randomly generated problems show that the iterative approach performs better than the others.
引用
收藏
页码:2989 / 3003
页数:15
相关论文
共 50 条
  • [1] Due-date quotation model for manufacturing system scheduling under uncertainty
    Wang, Zhiguo
    Ng, Tsan Sheng
    Pang, Chee Khiang
    [J]. DISCRETE EVENT DYNAMIC SYSTEMS-THEORY AND APPLICATIONS, 2021, 31 (02): : 271 - 293
  • [2] Due-date quotation model for manufacturing system scheduling under uncertainty
    Zhiguo Wang
    Tsan Sheng Ng
    Chee Khiang Pang
    [J]. Discrete Event Dynamic Systems, 2021, 31 : 271 - 293
  • [3] Analysis of dynamic due-date assignment models in a flexible manufacturing system
    Joseph, O. A.
    Sridharan, R.
    [J]. JOURNAL OF MANUFACTURING SYSTEMS, 2011, 30 (01) : 28 - 40
  • [4] A due-date oriented scheduling heuristic for job shop cellular manufacturing system
    Tsai, CH
    Li, RK
    [J]. INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING-THEORY APPLICATIONS AND PRACTICE, 2000, 7 (01): : 76 - 88
  • [5] Due-date oriented scheduling heuristic for job shop cellular manufacturing system
    [J]. Tsai, Chih-Hung, 2000, University of Cincinnati, Cincinnati, OH, United States (07):
  • [6] Optimization of due-date objectives in scheduling semiconductor batch manufacturing
    Gupta, A. K.
    Sivakumar, A. I.
    [J]. INTERNATIONAL JOURNAL OF MACHINE TOOLS & MANUFACTURE, 2006, 46 (12-13): : 1671 - 1679
  • [7] Tool requirements planning in a flexible manufacturing system with an automatic tool transporter
    Kim, YD
    Lee, GC
    Choi, SK
    Lim, SK
    [J]. IEEE TRANSACTIONS ON ROBOTICS AND AUTOMATION, 2001, 17 (06): : 795 - 804
  • [8] Heuristics for a tool provisioning problem in a flexible manufacturing system with an automatic tool transporter
    Jun, HB
    Kim, YD
    Suh, HW
    [J]. IEEE TRANSACTIONS ON ROBOTICS AND AUTOMATION, 1999, 15 (03): : 488 - 496
  • [9] Integrated Optimal Algorithm for Flexible Job Shop Scheduling with Due-date Window
    Song, Juan
    [J]. PROCEEDINGS OF THE 10TH WORLD CONGRESS ON INTELLIGENT CONTROL AND AUTOMATION (WCICA 2012), 2012, : 638 - 642
  • [10] Due date and cost-based FMS loading, scheduling and tool management
    Turkcan, Ayten
    Akturk, M. Selim
    Storer, Robert H.
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2007, 45 (05) : 1183 - 1213