A due-date oriented scheduling heuristic for job shop cellular manufacturing system

被引:0
|
作者
Tsai, CH [1 ]
Li, RK
机构
[1] Ta Hwa Inst Technol, Dept Ind Engn & Management, Hsinchu, Taiwan
[2] Natl Chiao Tung Univ, Dept Ind Engn & Management, Hsinchu, Taiwan
关键词
flowtime; TOC; DBR; Capacity Constraint Resource (CCR); hybrid scheduling;
D O I
暂无
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Although having gained further insight into scheduling problems involving cellular manufacturing systems, previous research has neglected two characteristics that are essential for effective group scheduling: first, due-date performance focus; second, setup time savings by emphasizing constrained and non-constrained machines. To overcome these two characteristics, we present a due-date oriented scheduling heuristic algorithm for jab shop cellular manufacturing system based on Capacity Constraint Resource (CCR). The proposed algorithm consists of four stages: (1) schedule development for CCR (DRUM), (2) CCR setup time savings to decrease mean tardiness, (3) CCR setup time savings to maximize CCR throughput, and (4) development of a hybrid scheduling method to minimize total flowtime and the work-in-process (WIP) inventory. Also, an illustrative example demonstrates the feasibility of the proposed method. Significance: This study has developed a due-date oriented scheduling heuristic algorithm for job shop cellular manufacturing environments. The proposed algorithm's strong performance indicates that our four-stage group scheduling heuristic, with its more sensitive switching procedures, can not only overcome some of the weaknesses shown by exhaustive and non-exhaustive scheduling heuristics, but can also glean setup time savings without sacrificing due-date performance.
引用
收藏
页码:76 / 88
页数:13
相关论文
共 50 条