Sequencing and scheduling of job and tool in a flexible manufacturing cell

被引:19
|
作者
Prabaharan, T. [1 ]
Nakkeeran, P. R.
Jawahar, N.
机构
[1] Mepco Schlenk Engn Coll, Dept Mech Engn, Mepco Engn Coll Post 626005, Tamil Nadu, India
[2] Anna Univ, Coll Engn, Dept Mech Engn, Madras 600025, Tamil Nadu, India
[3] Thiagarajar Coll Engn, Dept Mech Engn, Madurai 625015, Tamil Nadu, India
关键词
flexible manufacturing; heuristics; priority dispatching rules; scheduling; Sequencing; simulated annealing algorithm;
D O I
10.1007/s00170-005-2567-3
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Flexible manufacturing cells (FMCs) are now common place in many manufacturing companies, due to their numerous advantages such as the production of a wide range of part types with short lead times, low work-in-progress, economical production of small batches and high resource utilization. Part and tool flows, two major dynamic entities, are the key factors and their management plays an important role in the operation of a FMC. The theme of this paper is to a generate joint operation - tool schedule in a FMC consisting of several machines and a common tool magazine (CTM). To achieve this aim, the jobs and tools must be jointly sequenced and scheduled in a tool constrained environment. Two heuristic algorithms, priority dispatching rules algorithm (PDRA) and simulated annealing algorithm (SAA) are proposed to derive optimal solutions. PDRA, are the most frequently applied heuristics for solving job shop/combinatorial scheduling problems in practice because of their ease of implementation and their low complexity, when compared with excel algorithms. SAA that belong to search categories, which are emerging along with the high computational capability of computers, can be used for FMS scheduling problems. Both adopt the Giffler & Thompson procedure for active feasible schedule generation. The performance of these two algorithms is compared with makespan and computational time. The analysis reveals that the SAA based heuristic provides an optimal or near optimal solution with reasonable computational time.
引用
收藏
页码:729 / 745
页数:17
相关论文
共 50 条
  • [1] Sequencing and scheduling of job and tool in a flexible manufacturing cell
    Prabaharan, T.
    Nakkeeran, P.R.
    Jawahar, N.
    [J]. International Journal of Advanced Manufacturing Technology, 2006, 29 (7-8): : 729 - 745
  • [2] Sequencing and scheduling of job and tool in a flexible manufacturing cell
    T. Prabaharan
    P.R. Nakkeeran
    N. Jawahar
    [J]. The International Journal of Advanced Manufacturing Technology, 2006, 29 : 729 - 745
  • [3] Joint job/tool scheduling in a flexible manufacturing cell with no on-board tool magazine
    Agnetis, A
    Alfieri, A
    Brandimarte, P
    Prinsecchi, P
    [J]. COMPUTER INTEGRATED MANUFACTURING SYSTEMS, 1997, 10 (01): : 61 - 68
  • [4] Sequencing and scheduling of job and tool in a flexible manufacturing system using ant colony optimization algorithm
    Udhayakumar, P.
    Kumanan, S.
    [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2010, 50 (9-12): : 1075 - 1084
  • [5] Sequencing and scheduling of job and tool in a flexible manufacturing system using ant colony optimization algorithm
    P. Udhayakumar
    S. Kumanan
    [J]. The International Journal of Advanced Manufacturing Technology, 2010, 50 : 1075 - 1084
  • [6] Priority Scheduling for a Flexible Job Shop with a Reconfigurable Manufacturing Cell
    Doh, Hyoung-Ho
    Yu, Jae-Min
    Kwon, Yong-Ju
    Lee, Dong-Ho
    Suh, Min-Suk
    [J]. INDUSTRIAL ENGINEERING AND MANAGEMENT SYSTEMS, 2016, 15 (01): : 11 - 18
  • [7] Tool handling and scheduling in a two-machine flexible manufacturing cell
    Agnetis, A
    Dror, M
    Vakharia, AJ
    Rossi, F
    [J]. IIE TRANSACTIONS, 1996, 28 (05) : 425 - 437
  • [8] Tool handling and scheduling in a two-machine flexible manufacturing cell
    Universita di Roma 'La Sapienza', Roma, Italy
    [J]. IIE Trans, 5 (425-437):
  • [9] Evaluation of scheduling strategies for a dynamic job shop in a tool-shared, flexible manufacturing environment
    Xu, Z
    Randhawa, S
    [J]. PRODUCTION PLANNING & CONTROL, 1998, 9 (01) : 74 - 86
  • [10] A DISTRIBUTED APPROACH TO JOB SCHEDULING IN A FLEXIBLE MANUFACTURING SYSTEM
    AHLUWALIA, RS
    JI, P
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 1991, 20 (01) : 95 - 103