共 50 条
- [24] Minimising costs in scheduling railway track maintenance COMPUTERS IN RAILWAYS VII, 2000, 7 : 895 - 902
- [25] SCHEDULE DEVELOPMENT UNDER STOCHASTIC SCHEDULING. Journal of the Construction Division, 1982, 108 (CO2): : 321 - 329
- [27] SHOP FLOOR CONTROL AND PRIORITY SCHEDULING. Production and inventory management Washington, D.C., 1987, 28 (02): : 50 - 58
- [28] ASPECTS OF THE USE OF COMPUTERS IN MAINTENANCE MANAGEMENT: TWO CASE STUDIES - 1. APPLICATION OF COMPUTERS TO PREVENTIVE MAINTENANCE SCHEDULING. Terotechnica, 1980, 1 (03): : 187 - 196