共 50 条
- [31] Computer Aided Work Scheduling. Development of a System for Single and Large Scale Production. VDI-Z, 1987, 129 (01): : 44 - 48
- [33] FUNDAMENTALS OF CRITICAL PATH PLANNING AND SCHEDULING. Cost Engineering (Morgantown, West Virginia), 1986, 28 (10): : 20 - 24
- [34] ROLE OF EVAPOTRANSPIRATION MODELS IN IRRIGATION SCHEDULING. Transactions of the American Society of Agricultural Engineers, 1978, 21 (01): : 82 - 87
- [36] Operation related maintenance and reinvestment costs for hydropower scheduling ENERGY SYSTEMS-OPTIMIZATION MODELING SIMULATION AND ECONOMIC ASPECTS, 2023,
- [37] Cybertraining: Activities and Time Scheduling. A Case Study IMPACT OF THE 4TH INDUSTRIAL REVOLUTION ON ENGINEERING EDUCATION, ICL2019, VOL 1, 2020, 1134 : 601 - 613
- [38] LINKING LEVEL REQUIREMENTS IN PRODUCTION PLANNING AND SCHEDULING. Production and inventory management Washington, D.C., 1987, 28 (02): : 123 - 131
- [39] PRODUCT STRUCTURING CONSIDERATIONS FOR MASTER PRODUCTION SCHEDULING. Production & Inventory Management, 1984, 25 (01): : 83 - 99
- [40] DEVELOPMENT AND EVALUATION OF EVAPOTRANSPIRATION MODELS FOR IRRIGATION SCHEDULING. Transactions of the American Society of Agricultural Engineers, 1978, 21 (01): : 88 - 91