NEW BOUND FOR MACHINE SCHEDULING.

被引:0
|
作者
Bestwick, Paul F.
Hastings, N.A.J.
机构
来源
| 1600年 / 27期
关键词
Compendex;
D O I
暂无
中图分类号
学科分类号
摘要
OPERATIONS RESEARCH
引用
收藏
相关论文
共 50 条
  • [1] NEW BOUND FOR MACHINE SCHEDULING
    BESTWICK, PF
    HASTINGS, NAJ
    OPERATIONAL RESEARCH QUARTERLY, 1976, 27 (02) : 479 - 487
  • [2] DECENTRALISED SCHEDULING.
    Casey, L.M.
    Australian Computer Journal, 1981, 13 (02): : 58 - 63
  • [3] MANPOWER SCHEDULING.
    Browne, James J.
    Tibrewala, Rajen K.
    Industrial Engineering (Norcross, Georgia), 1975, 7 (08): : 22 - 23
  • [5] SOME NEW RESULTS IN FLOW SHOP SCHEDULING.
    Roeck, Hans
    ZOR. Zeitschrift fur Operations-Research, 1984, 28 (01): : 1 - 16
  • [6] Computerization of construction scheduling.
    Lee, KS
    KORUS 2003: 7TH KOREA-RUSSIA INTERNATIONAL SYMPOSIUM ON SCIENCE AND TECHNOLOGY, VOL 4, PROCEEDINGS: LIFE SCIENCE, BIOTECHNOLOGY, MEDICINE ENVIRONMENTAL TECHNOLOGY, ARCHITECTURE ENGINEERING EDUCATION SOCIAL SCIENCE, 2003, : 180 - 184
  • [7] APPLICATION OF LINEAR SCHEDULING.
    Chrzanowski, Edmund N.
    Johnston, David W.
    Journal of Construction Engineering and Management, 1986, 112 (04) : 476 - 491
  • [8] USING FRAMES IN SCHEDULING.
    Goldstein, Ira P.
    Roberts, Bruce
    Energy Technology Review, 1979, 1 : 253 - 284
  • [9] Airline operations and scheduling.
    Lev, Benjamin
    INTERFACES, 2006, 36 (04) : 371 - 372
  • [10] PROBABILITIC APPROACH TO IRRIGATION SCHEDULING.
    Tyagi, N.K.
    Gupta, R.K.
    Singh, O.P.
    Journal of the Institution of Engineers (India): Agricultural Engineering Division, 1984, 64 (pt 2): : 58 - 61