NEW BOUND FOR MACHINE SCHEDULING.

被引:0
|
作者
Bestwick, Paul F.
Hastings, N.A.J.
机构
来源
| 1600年 / 27期
关键词
Compendex;
D O I
暂无
中图分类号
学科分类号
摘要
OPERATIONS RESEARCH
引用
收藏
相关论文
共 50 条
  • [21] Finite capacity scheduling. Believable, achievable
    Huffman, David A., 1600, (09):
  • [22] Irrigation scheduling. II: Heuristics approach
    Anwar, AA
    de Vries, TT
    JOURNAL OF IRRIGATION AND DRAINAGE ENGINEERING, 2004, 130 (01) : 17 - 25
  • [23] A NEW LOWER-BOUND FOR THE MAKESPAN OF A SINGLE-MACHINE SCHEDULING PROBLEM
    TINHOFER, G
    FARNBACHER, E
    LECTURE NOTES IN CONTROL AND INFORMATION SCIENCES, 1992, 180 : 209 - 218
  • [24] SLASH MAINTENANCE COSTS WITH COMPUTERIZED WORK SCHEDULING.
    Landman, B.C.
    Pulp and Paper Canada, 1986, 87 (02): : 63 - 66
  • [25] FUNDAMENTALS OF CRITICAL PATH PLANNING AND SCHEDULING.
    Stumpo Jr., Anthony R.
    Cost Engineering (Morgantown, West Virginia), 1986, 28 (10): : 20 - 24
  • [26] Modern Order Organization in Work Scheduling.
    Kluge, Hermann
    Beckendorff, Ulrich
    Anders, Nico
    VDI-Z, 1987, l29 (07): : 42 - 49
  • [27] ROLE OF EVAPOTRANSPIRATION MODELS IN IRRIGATION SCHEDULING.
    Jensen, Marvin E.
    Wright, James L.
    Transactions of the American Society of Agricultural Engineers, 1978, 21 (01): : 82 - 87
  • [28] ON THE COMPLEXITY OF MEAN FLOW TIME SCHEDULING.
    Sethi, Ravi
    Mathematics of Operations Research, 1977, 2 (04) : 320 - 330
  • [29] Cybertraining: Activities and Time Scheduling. A Case Study
    Isoc, Dorin
    Surubaru, Teodora
    IMPACT OF THE 4TH INDUSTRIAL REVOLUTION ON ENGINEERING EDUCATION, ICL2019, VOL 1, 2020, 1134 : 601 - 613
  • [30] LINKING LEVEL REQUIREMENTS IN PRODUCTION PLANNING AND SCHEDULING.
    Burch, E.Earl
    Oliff, Michael D.
    Sumichrast, Robert T.
    Production and inventory management Washington, D.C., 1987, 28 (02): : 123 - 131