RENEWAL PROCESS MODEL FOR USE IN SEISMIC RISK ANALYSIS.

被引:0
|
作者
Kameda, Hiroyuki
Ozaki, Yoichiro
机构
关键词
Engineering Village;
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
页码:11 / 35
相关论文
共 50 条
  • [1] LINE SOURCE MODEL FOR SEISMIC RISK ANALYSIS.
    der Kiureghian, A.
    Ang, A.H.S.
    Civil Engineering Studies, Structural Research Series (University of Illinois at Urbana-Champaign, Department of Civil Engineering), 1975, (419):
  • [2] MODEL FOR FRACTURE RISK ANALYSIS.
    Cioclov, D.D.
    Revue roumaine des sciences techniques. Serie de mecanique appliquee, 1986, 31 (06): : 613 - 622
  • [3] TEMPORAL CHANGE OF SEISMIC LOAD BY PROBABILISTIC SEISMIC HAZARD ANALYSIS WITH RENEWAL PROCESS
    Hayashi, Takayuki
    Yashiro, Harumi
    INTERNATIONAL JOURNAL OF GEOMATE, 2019, 16 (58): : 165 - 170
  • [4] ON THE USE OF JUDGMENT IN PROBABILISTIC RISK ANALYSIS.
    Apostolakis, George
    Nuclear Engineering and Design, 1985, 93 (2-3) : 161 - 166
  • [5] Drawdown analysis for the renewal insurance risk process
    Landriault, David
    Li, Bin
    Li, Shu
    SCANDINAVIAN ACTUARIAL JOURNAL, 2017, (03) : 267 - 285
  • [6] GLOSSARY OF TERMS FOR PROBABILISTIC SEISMIC-RISK AND HAZARD ANALYSIS.
    Shah, Haresh C.
    Earthquake Spectra, 1984, 1 (01) : 33 - 40
  • [7] A risk model with renewal shot-noise Cox process
    Dassios, Angelos
    Jang, Jiwook
    Zhao, Hongbiao
    INSURANCE MATHEMATICS & ECONOMICS, 2015, 65 : 55 - 65
  • [8] Limits of Risk Predictability in a Cascading Alternating Renewal Process Model
    Lin, Xin
    Moussawi, Alaa
    Korniss, Gyorgy
    Bakdash, Jonathan Z.
    Szymanski, Boleslaw K.
    SCIENTIFIC REPORTS, 2017, 7
  • [9] Limits of Risk Predictability in a Cascading Alternating Renewal Process Model
    Xin Lin
    Alaa Moussawi
    Gyorgy Korniss
    Jonathan Z. Bakdash
    Boleslaw K. Szymanski
    Scientific Reports, 7
  • [10] Synthesized Poisson and renewal model and its application in seismic hazard analysis
    Chen, Han-Yao
    Hu, Yu-Xian
    Acta Seismologica Sinica, 1994, 7 (suppl):