RENEWAL PROCESS MODEL FOR USE IN SEISMIC RISK ANALYSIS.

被引:0
|
作者
Kameda, Hiroyuki
Ozaki, Yoichiro
机构
关键词
Engineering Village;
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
页码:11 / 35
相关论文
共 50 条
  • [21] The use of PSA in a License Renewal Process
    van der Borst, M
    PROBABILISTIC SAFETY ASSESSMENT AND MANAGEMENT (PSAM 4), VOLS 1-4, 1998, : 301 - 306
  • [22] Renewal analysis of a replacement process
    Stadje, W
    OPERATIONS RESEARCH LETTERS, 2003, 31 (01) : 1 - 6
  • [23] Author Correction: Limits of Risk Predictability in a Cascading Alternating Renewal Process Model
    Xin Lin
    Alaa Moussawi
    Gyorgy Korniss
    Jonathan Z. Bakdash
    Boleslaw K. Szymanski
    Scientific Reports, 8
  • [24] Generalized renewal process (GRP) for the analysis of software reliability growth model
    Jain, Madhu
    Maheshwari, Sandhya
    ASIA-PACIFIC JOURNAL OF OPERATIONAL RESEARCH, 2006, 23 (02) : 215 - 227
  • [25] SYSTEMS MODEL FOR POPULATION RENEWAL PROCESS
    BONGAARTS, JP
    ONEILL, WD
    DEMOGRAPHY, 1972, 9 (02) : 309 - +
  • [26] On a general class of renewal risk process: Analysis of the Gerber-Shiu function
    Li, SM
    Garrido, J
    ADVANCES IN APPLIED PROBABILITY, 2005, 37 (03) : 836 - 856
  • [27] FAULT-RUPTURE MODEL FOR SEISMIC RISK ANALYSIS
    DERKIUREGHIAN, A
    ANG, AHS
    BULLETIN OF THE SEISMOLOGICAL SOCIETY OF AMERICA, 1977, 67 (04) : 1173 - 1194
  • [28] Risk Analysis in the Model of the Business Process
    Gorbunov, Vladimir
    Htet, Nyan Win
    Balashov, Alexander
    PROCEEDINGS OF THE 2016 IEEE NORTH WEST RUSSIA SECTION YOUNG RESEARCHERS IN ELECTRICAL AND ELECTRONIC ENGINEERING CONFERENCE (ELCONRUSNW), 2016, : 811 - 813
  • [29] On the analysis of ruin-related quantities in the delayed renewal risk model
    Kim, So-Yeun
    Willmot, Gordon E.
    INSURANCE MATHEMATICS & ECONOMICS, 2016, 66 : 77 - 85
  • [30] STRATEGY FOR IMPLEMENTING RISK ANALYSIS.
    Newendorp, Paul D.
    JPT, Journal of Petroleum Technology, 1984, 36 (11): : 1791 - 1796