Limits of Risk Predictability in a Cascading Alternating Renewal Process Model

被引:0
|
作者
Xin Lin
Alaa Moussawi
Gyorgy Korniss
Jonathan Z. Bakdash
Boleslaw K. Szymanski
机构
[1] Rensselaer Polytechnic Institute,Social and Cognitive Networks Academic Research Center
[2] Rensselaer Polytechnic Institute,Dept. of Computer Science
[3] Applied Physics and Astronomy,Dept. of Physics
[4] Aberdeen Proving Ground,US Army Research Laboratory
来源
关键词
D O I
暂无
中图分类号
学科分类号
摘要
Most risk analysis models systematically underestimate the probability and impact of catastrophic events (e.g., economic crises, natural disasters, and terrorism) by not taking into account interconnectivity and interdependence of risks. To address this weakness, we propose the Cascading Alternating Renewal Process (CARP) to forecast interconnected global risks. However, assessments of the model’s prediction precision are limited by lack of sufficient ground truth data. Here, we establish prediction precision as a function of input data size by using alternative long ground truth data generated by simulations of the CARP model with known parameters. We illustrate the approach on a model of fires in artificial cities assembled from basic city blocks with diverse housing. The results confirm that parameter recovery variance exhibits power law decay as a function of the length of available ground truth data. Using CARP, we also demonstrate estimation using a disparate dataset that also has dependencies: real-world prediction precision for the global risk model based on the World Economic Forum Global Risk Report. We conclude that the CARP model is an efficient method for predicting catastrophic cascading events with potential applications to emerging local and global interconnected risks.
引用
收藏
相关论文
共 50 条
  • [1] Limits of Risk Predictability in a Cascading Alternating Renewal Process Model
    Lin, Xin
    Moussawi, Alaa
    Korniss, Gyorgy
    Bakdash, Jonathan Z.
    Szymanski, Boleslaw K.
    SCIENTIFIC REPORTS, 2017, 7
  • [2] Author Correction: Limits of Risk Predictability in a Cascading Alternating Renewal Process Model
    Xin Lin
    Alaa Moussawi
    Gyorgy Korniss
    Jonathan Z. Bakdash
    Boleslaw K. Szymanski
    Scientific Reports, 8
  • [3] Limits of Risk Predictability in a Cascading Alternating Renewal Process Model (vol 7, 2017)
    Lin, Xin
    Moussawi, Alaa
    Korniss, Gyorgy
    Bakdash, Jonathan Z.
    Szymanski, Boleslaw K.
    SCIENTIFIC REPORTS, 2018, 8
  • [4] An alternating renewal process to model constellation availability
    Teo, K. H.
    Tai, K.
    Schena, V.
    Simonini, L.
    ADVANCES IN SPACE RESEARCH, 2021, 68 (09) : 3717 - 3730
  • [5] An Uncertain Alternating Renewal Insurance Risk Model
    Zhai, Jia
    Zheng, Haitao
    Bai, Manying
    Jiang, Yunyun
    MATHEMATICAL PROBLEMS IN ENGINEERING, 2020, 2020 (2020)
  • [6] MODEL OF POWER DEMAND BASED ON AN ALTERNATING RENEWAL PROCESS
    KORN, I
    IEEE TRANSACTIONS ON SYSTEMS MAN AND CYBERNETICS, 1977, 7 (11): : 799 - 803
  • [7] POISSON AND ALTERNATING RENEWAL PROCESSES WITH SUPERPOSITION A RENEWAL PROCESS
    DALEY, DJ
    MATHEMATISCHE NACHRICHTEN, 1973, 57 (1-6) : 359 - 369
  • [8] A non-homogeneous alternating renewal process model for interval censoring
    van Lieshout, M. N. M.
    Markwitz, R. L.
    JOURNAL OF APPLIED PROBABILITY, 2024,
  • [9] A stochastic alternating renewal process model for unavailability analysis of standby safety equipment
    van der Weide, J. A. M.
    Pandey, Mahesh D.
    RELIABILITY ENGINEERING & SYSTEM SAFETY, 2015, 139 : 97 - 104
  • [10] System availability in a gamma alternating renewal process
    Pham-Gia, T
    Turkkan, N
    NAVAL RESEARCH LOGISTICS, 1999, 46 (07) : 822 - 844