HEURISTIC METHODS FOR FLEXIBLE FLOW LINE SCHEDULING.

被引:0
|
作者
Kochhar, Sandeep [1 ]
Morris, Robert J.T. [1 ]
机构
[1] Harvard Univ, Cambridge, MA, USA, Harvard Univ, Cambridge, MA, USA
来源
| 1600年 / 06期
关键词
D O I
暂无
中图分类号
学科分类号
摘要
PRODUCTION CONTROL
引用
收藏
相关论文
共 50 条
  • [41] Heuristic Techniques for Single Line Train Scheduling
    Higgins A.
    Kozan E.
    Ferreira L.
    Journal of Heuristics, 1997, 3 (1) : 43 - 62
  • [42] ROUTE CONSTRAINED FLEET SCHEDULING.
    Orloff, Clifford S.
    Transportation Science, 1976, 10 (02): : 149 - 168
  • [43] NEW BOUND FOR MACHINE SCHEDULING.
    Bestwick, Paul F.
    Hastings, N.A.J.
    1600, (27):
  • [44] Heuristic Search for Scheduling Flexible Manufacturing Systems Using Multiple Heuristic Functions
    Huang, Bo
    Jiang, Rongxi
    Zhang, Gongxuan
    MODERN ADVANCES IN APPLIED INTELLIGENCE, IEA/AIE 2014, PT I, 2014, 8481 : 178 - 187
  • [45] HEURISTIC SOLUTION TO THE SCHEDULING PROBLEMS IN FLEXIBLE MANUFACTURING SYSTEM
    MUKHOPADHYAY, SK
    MAITI, B
    GARG, S
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1991, 29 (10) : 2003 - 2024
  • [46] SCHEDULE DEVELOPMENT UNDER STOCHASTIC SCHEDULING.
    Crandall, Keith C.
    Woolery, John C.
    Journal of the Construction Division, 1982, 108 (CO2): : 321 - 329
  • [47] USING THE METHOD OF MULTIPLE SUPPLY SCHEDULING.
    Mihailescu, Al.
    1600,
  • [48] SHOP FLOOR CONTROL AND PRIORITY SCHEDULING.
    Putnam, Arnold O.
    Production and inventory management Washington, D.C., 1987, 28 (02): : 50 - 58
  • [49] A robust genetic algorithm for scheduling realistic hybrid flexible flow line problems
    Zandieh, M.
    Mozaffari, E.
    Gholami, M.
    JOURNAL OF INTELLIGENT MANUFACTURING, 2010, 21 (06) : 731 - 743
  • [50] A robust genetic algorithm for scheduling realistic hybrid flexible flow line problems
    M. Zandieh
    E. Mozaffari
    M. Gholami
    Journal of Intelligent Manufacturing, 2010, 21 : 731 - 743