This article addresses the problem of hybrid flexible flow line where some constraints are considered to alleviate the chasm between the real-world industries scheduling and the production scheduling theories. Sequence-dependent setup times, machine release date and time lags are three constraints deemed to project the circumstances commonly found in real-world industries. To tackle the complexity of the problem at hand, we propose an approach base on genetic algorithm (GA). However, the performance of most evolutionary algorithms is significantly impressed by the values determined for the miscellaneous parameters which these algorithms possess. Hence, response surface methodology is applied to set the parameters of GA and to estimate the proper values of GA parameters in continually intervals. Finally, problems of various sizes are utilized to test the performance of the proposed algorithm and to compare it with some existing heuristic in the literature such as SPT, LPT and NEH.
机构:
Univ Lille Nord France, Lille, France
UVHC, TEMPO, EA 4542, F-59313 Valenciennes, France
Fac Sci Econ & Gest Sfax, Sfax, TunisiaUniv Lille Nord France, Lille, France
Chaari, Tarek
Chaabane, Sondes
论文数: 0引用数: 0
h-index: 0
机构:
Univ Lille Nord France, Lille, France
UVHC, TEMPO, EA 4542, F-59313 Valenciennes, FranceUniv Lille Nord France, Lille, France
Chaabane, Sondes
Loukil, Taicir
论文数: 0引用数: 0
h-index: 0
机构:
Inst Super Gest Ind Sfax, LOGIQ, Sfax, TunisiaUniv Lille Nord France, Lille, France
Loukil, Taicir
Trentesaux, Damien
论文数: 0引用数: 0
h-index: 0
机构:
Univ Lille Nord France, Lille, France
UVHC, TEMPO, EA 4542, F-59313 Valenciennes, FranceUniv Lille Nord France, Lille, France