MANPOWER SCHEDULING.

被引:0
|
作者
Browne, James J.
Tibrewala, Rajen K.
机构
来源
关键词
Compendex;
D O I
暂无
中图分类号
学科分类号
摘要
INDUSTRIAL ENGINEERING
引用
收藏
页码:22 / 23
相关论文
共 50 条
  • [31] MICRO-COMPUTER SYSTEM AIDS IN SCHEDULING.
    Anker, R.
    Pipe line industry Houston, Tex., 1986, 65 (05): : 45 - 46
  • [32] ON MANPOWER SCHEDULING ALGORITHMS
    TIEN, JM
    KAMIYAMA, A
    SIAM REVIEW, 1982, 24 (03) : 275 - 287
  • [33] MANPOWER SCHEDULING - REPLY
    BROWNE, JJ
    TIBREWALA, R
    INDUSTRIAL ENGINEERING, 1975, 7 (12): : 56 - 56
  • [34] TOTAL FRAMEWORK FOR SEMICONDUCTOR PRODUCTION PLANNING AND SCHEDULING.
    Golovin, Jonathan J.
    1600, (29):
  • [35] HEURISTIC METHODS FOR FLEXIBLE FLOW LINE SCHEDULING.
    Kochhar, Sandeep
    Morris, Robert J.T.
    1600, (06):
  • [36] Multiprocessor Tasks Scheduling. Fuzzy Logic Approach
    Dorota, Dariusz
    NEW ADVANCES IN DEPENDABILITY OF NETWORKS AND SYSTEMS, DEPCOS-RELCOMEX 2022, 2022, 484 : 50 - 62
  • [37] SOME NEW RESULTS IN FLOW SHOP SCHEDULING.
    Roeck, Hans
    ZOR. Zeitschrift fur Operations-Research, 1984, 28 (01): : 1 - 16
  • [38] MULTIPLE CRITERIA DECISION AID FOR PERSONNEL SCHEDULING.
    Koelling, C.Patrick
    Bailey, James E.
    IIE Transactions (Institute of Industrial Engineers), 1984, 16 (04): : 299 - 307
  • [39] APPLICATION OF TECHNIQUES OF ARTIFICIAL INTELLIGENCE TO TIMETABLE SCHEDULING.
    Lin, Zhangxi
    Lin, Yaorui
    Ching Hua Ta Hsueh Hsueh Pao/ Journal of Ching Hua University, 1984, 24 (02): : 1 - 9
  • [40] Necessary Capacity Reserve as a Problem of Plant Operation Scheduling.
    Schaeper, Wolfgang
    OZE, Oesterreichische Zeitschrift fuer Elektrizitaetswirtschaft, 1980, 33 (3-4): : 94 - 98