Necessary Capacity Reserve as a Problem of Plant Operation Scheduling.

被引:0
|
作者
Schaeper, Wolfgang
机构
关键词
SCHEDULING;
D O I
暂无
中图分类号
学科分类号
摘要
A practical method for determining the capacity reserve necessary for operational reasons is presented. This allows the control engineer to calculate, for the respective daily plant operation plan, the minute and hour reserve necessary to ensure a given system reliability. On the basis of an analysis of the operating behavior of the individual generating units as well as of a model of reserve operation following power station failure, the basic steps of the recursive cumulative failure probability method are explained using two realistic mathematical problems. Several factors affecting the reserve are discussed, with special attention to the importance of the reliability level.
引用
收藏
页码:94 / 98
相关论文
共 50 条
  • [1] Finite capacity scheduling. Believable, achievable
    Huffman, David A., 1600, (09):
  • [2] VENDOR CAPACITY PLANNING: AN APPROACH TO VENDOR SCHEDULING.
    Carter, Phillip L.
    Ho, Chrwan-jyh
    Production & Inventory Management, 1984, 25 (04): : 63 - 74
  • [3] Three dimensional Bin Packing Problem in batch scheduling.
    Koblasa, Frantisek
    Vavrousek, Miroslav
    Manlig, Frantisek
    34TH INTERNATIONAL CONFERENCE MATHEMATICAL METHODS IN ECONOMICS (MME 2016), 2016, : 407 - 412
  • [4] Multiproduct plant operation scheduling
    Malygin, EN
    Frolova, TA
    Krasnyanskii, MN
    THEORETICAL FOUNDATIONS OF CHEMICAL ENGINEERING, 1998, 32 (05) : 518 - 525
  • [5] Scheduling Problem on Operation Rooms
    Mohri, Shintaro
    Ishii, Hiroaki
    PROCEEDINGS OF THE 20TH CZECH-JAPAN SEMINAR ON DATA ANALYSIS AND DECISION MAKING UNDER UNCERTAINTY, 2017, : 109 - 114
  • [6] THE HUB OPERATION SCHEDULING PROBLEM
    MINAS, JS
    MITTEN, LG
    OPERATIONS RESEARCH, 1958, 6 (03) : 329 - 345
  • [7] Reserve market scheduling considering both capacity and energy bids of reserve
    Bahmanzadeh, Majid
    Foroud, Asghar Akbari
    INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS, 2016, 81 : 1 - 11
  • [8] Optimal Weekly Operation Scheduling of Pumped Storage Hydropower Plant Considering Optimal Hot Reserve Capacity in a Power System with a Large Penetration of Photovoltaic Generation
    Aihara, Ryota
    Yokoyama, Akihiko
    ELECTRICAL ENGINEERING IN JAPAN, 2016, 195 (02) : 35 - 48
  • [9] Optimal weekly operation scheduling of pumped storage hydro power plant considering optimal hot reserve capacity in a power system with a large penetration of photovoltaic generation
    Aiharaa, Ryota
    Yokoyama, Akihiko
    IEEJ Transactions on Power and Energy, 2015, 135 (03) : 141 - 152
  • [10] OPTIMAL SCHEDULING FOR OPERATION OF OXYGEN PLANT
    ABE, S
    TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1984, 70 (12): : S943 - S943