Necessary Capacity Reserve as a Problem of Plant Operation Scheduling.

被引:0
|
作者
Schaeper, Wolfgang
机构
关键词
SCHEDULING;
D O I
暂无
中图分类号
学科分类号
摘要
A practical method for determining the capacity reserve necessary for operational reasons is presented. This allows the control engineer to calculate, for the respective daily plant operation plan, the minute and hour reserve necessary to ensure a given system reliability. On the basis of an analysis of the operating behavior of the individual generating units as well as of a model of reserve operation following power station failure, the basic steps of the recursive cumulative failure probability method are explained using two realistic mathematical problems. Several factors affecting the reserve are discussed, with special attention to the importance of the reliability level.
引用
收藏
页码:94 / 98
相关论文
共 50 条
  • [41] Optimal Weekly Operation Scheduling on Pumped Storage Hydro Power Plant and Storage Battery Considering Reserve Margin with a Large Penetration of Renewable Energy
    Kumano, J.
    Yokoyama, A.
    2014 INTERNATIONAL CONFERENCE ON POWER SYSTEM TECHNOLOGY (POWERCON), 2014, : 1120 - 1126
  • [42] Impact on hydropower plant income from participating in reserve capacity markets
    Haugen, Mari
    Schaffer, Linn Emelie
    Mo, Birger
    Helseth, Arild
    2020 17TH INTERNATIONAL CONFERENCE ON THE EUROPEAN ENERGY MARKET, EEM, 2020,
  • [43] Optimal Seasonal Spinning Reserve Scheduling for Islanded Microgrid Operation Under Contingency Conditions
    Masaud, Tarek Medalel
    Siddiqui, Mohammed Imad Ul Haq
    2022 IEEE CONFERENCE ON TECHNOLOGIES FOR SUSTAINABILITY (SUSTECH), 2022, : 209 - 213
  • [44] Distributionally Robust Solution to the Reserve Scheduling Problem With Partial Information of Wind Power
    Bian, Qiaoyan
    Xin, Huanhai
    Wang, Zhen
    Gan, Deqiang
    Wong, Kit Po
    IEEE TRANSACTIONS ON POWER SYSTEMS, 2015, 30 (05) : 2822 - 2823
  • [45] A scheduling problem for a finite buffer capacity pull manufacturing system
    Martinelli, F
    Valigi, P
    PROCEEDINGS OF THE 37TH IEEE CONFERENCE ON DECISION AND CONTROL, VOLS 1-4, 1998, : 2171 - 2172
  • [46] A Heuristic Approach for Vehicle Scheduling Problem with Time and Capacity Constraints
    Masoud, Mohamed
    Lee, Sanghoon
    Belkasim, Saeid
    2016 UKSIM-AMSS 18TH INTERNATIONAL CONFERENCE ON COMPUTER MODELLING AND SIMULATION (UKSIM), 2016, : 230 - 234
  • [47] Multiple-resource periodic scheduling problem:: how much fairness is necessary?
    Zhu, D
    Mossé, D
    Melhem, R
    RTSS 2003: 24TH IEEE INTERNATIONAL REAL-TIME SYSTEMS SYMPOSIUM, PROCEEDINGS, 2003, : 142 - 151
  • [48] Possible and necessary optimality of solutions in the single machine scheduling problem with fuzzy parameters
    Chanas, S
    Kasperski, A
    FUZZY SETS AND SYSTEMS, 2004, 142 (03) : 359 - 371
  • [49] Implications of environmental constraints in hydropower scheduling for a power system with limited grid and reserve capacity
    Schaffer, Linn Emelie
    Korpas, Magnus
    Bakken, Tor Haakon
    ENERGY SYSTEMS-OPTIMIZATION MODELING SIMULATION AND ECONOMIC ASPECTS, 2023,
  • [50] A Joint Optimization Model for Energy and Reserve Capacity Scheduling With the Integration of Variable Energy Resources
    Hassan, M. Wajahat
    Alquthami, Thamer
    Milyani, Ahmad H.
    Ahmad, Ashfaq
    Rasheed, Muhammad Babar
    IEEE ACCESS, 2021, 9 : 75252 - 75264